Abolfazl Jalilvand, S. Khanmohammadi, F. Shabaninia
{"title":"并行多处理器系统中基于分支和边界的Petri网的顺序相关作业调度","authors":"Abolfazl Jalilvand, S. Khanmohammadi, F. Shabaninia","doi":"10.1109/ICET.2005.1558904","DOIUrl":null,"url":null,"abstract":"This paper presents a new branch-and-bound algorithm for minimizing the make-span of a job-shop scheduling problem where n jobs must be scheduled on m machines. It is assumed that the jobs are available at time zero and have sequence-dependent setup times on machines. For solving the scheduling problem we develop a new branch and bound system which constructs its search tree gradually and does not need a large size memory. An upper-bound cost (UBC) is introduced to initialize the root node in search tree which reduces Branch and Bound computations. For modeling the manufacturing system and applying the desired sequence-dependent schedule on it, a supervisor Petri net is introduced. The proposed methods are verified through a computational experiment","PeriodicalId":222828,"journal":{"name":"Proceedings of the IEEE Symposium on Emerging Technologies, 2005.","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Scheduling of sequence-dependant jobs on parallel multiprocessor systems using a branch and bound-based Petri net\",\"authors\":\"Abolfazl Jalilvand, S. Khanmohammadi, F. Shabaninia\",\"doi\":\"10.1109/ICET.2005.1558904\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a new branch-and-bound algorithm for minimizing the make-span of a job-shop scheduling problem where n jobs must be scheduled on m machines. It is assumed that the jobs are available at time zero and have sequence-dependent setup times on machines. For solving the scheduling problem we develop a new branch and bound system which constructs its search tree gradually and does not need a large size memory. An upper-bound cost (UBC) is introduced to initialize the root node in search tree which reduces Branch and Bound computations. For modeling the manufacturing system and applying the desired sequence-dependent schedule on it, a supervisor Petri net is introduced. The proposed methods are verified through a computational experiment\",\"PeriodicalId\":222828,\"journal\":{\"name\":\"Proceedings of the IEEE Symposium on Emerging Technologies, 2005.\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the IEEE Symposium on Emerging Technologies, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICET.2005.1558904\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the IEEE Symposium on Emerging Technologies, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICET.2005.1558904","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scheduling of sequence-dependant jobs on parallel multiprocessor systems using a branch and bound-based Petri net
This paper presents a new branch-and-bound algorithm for minimizing the make-span of a job-shop scheduling problem where n jobs must be scheduled on m machines. It is assumed that the jobs are available at time zero and have sequence-dependent setup times on machines. For solving the scheduling problem we develop a new branch and bound system which constructs its search tree gradually and does not need a large size memory. An upper-bound cost (UBC) is introduced to initialize the root node in search tree which reduces Branch and Bound computations. For modeling the manufacturing system and applying the desired sequence-dependent schedule on it, a supervisor Petri net is introduced. The proposed methods are verified through a computational experiment