需求不精确,交货时间不确定的MRP

R. Guillaume, C. Thierry, B. Grabot
{"title":"需求不精确,交货时间不确定的MRP","authors":"R. Guillaume, C. Thierry, B. Grabot","doi":"10.2991/eusflat.2011.131","DOIUrl":null,"url":null,"abstract":"Taking into account the uncertainty of real data in the planning process is a real challenge for nowadays companies. It is suggested in this communication to take into account the demand uncertainty, but also the uncertainty on the lead times, for deciding which quantities of components should be released, and when. In that purpose, the various situations that may happen are summarized in a graph which design is detailed here.","PeriodicalId":403191,"journal":{"name":"EUSFLAT Conf.","volume":"33 1-2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"MRP with imprecise demand and uncertain lead time\",\"authors\":\"R. Guillaume, C. Thierry, B. Grabot\",\"doi\":\"10.2991/eusflat.2011.131\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Taking into account the uncertainty of real data in the planning process is a real challenge for nowadays companies. It is suggested in this communication to take into account the demand uncertainty, but also the uncertainty on the lead times, for deciding which quantities of components should be released, and when. In that purpose, the various situations that may happen are summarized in a graph which design is detailed here.\",\"PeriodicalId\":403191,\"journal\":{\"name\":\"EUSFLAT Conf.\",\"volume\":\"33 1-2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-08-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EUSFLAT Conf.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/eusflat.2011.131\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EUSFLAT Conf.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/eusflat.2011.131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在规划过程中考虑到实际数据的不确定性是当今公司面临的真正挑战。建议在本通讯中考虑到需求的不确定性,但也考虑到交货时间的不确定性,以决定应该释放多少数量的部件,以及何时释放。为此,可能发生的各种情况总结在一个图表中,这里有详细的设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
MRP with imprecise demand and uncertain lead time
Taking into account the uncertainty of real data in the planning process is a real challenge for nowadays companies. It is suggested in this communication to take into account the demand uncertainty, but also the uncertainty on the lead times, for deciding which quantities of components should be released, and when. In that purpose, the various situations that may happen are summarized in a graph which design is detailed here.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信