水井水力发电项目渔业设施

R. Loder, M. Erho
{"title":"水井水力发电项目渔业设施","authors":"R. Loder, M. Erho","doi":"10.1061/JPWEAM.0000656","DOIUrl":null,"url":null,"abstract":"The development of the fish passage and fish spawning facilities for the Wells Hydroelectric Project is described. Because the spillway and powerhouse are combined into a single structure in the unique Hydrocombine concept conceived for the Wells Project, the conventional fish passage facilities could not be directly used at the Wells Project. A fish attraction system was developed by using submerged high velocity water jets at each end of the Hydrocombine to provide an attraction flow across the downstream face of the Hydrocombine. The jet locations and jet flow were developed from hydraulic model tests of the Hydrocombine structure. Two staircase type fish ladders are provided for passage of fish over the Hydrocombine, one ladder located at each end of the Hydrocombine. An extensive fish spawning facility was constructed immediately downstream from the west embankment of the dam. Located in the west fish ladder is a sorting facility for diverting selected fish to the spawning channel. A 150-acre artificial pond for rearing steelhead trout is constructed in the Wells Reservoir.","PeriodicalId":136288,"journal":{"name":"Journal of the Power Division","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1971-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Wells Hydroelectric Project Fish Facilities\",\"authors\":\"R. Loder, M. Erho\",\"doi\":\"10.1061/JPWEAM.0000656\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of the fish passage and fish spawning facilities for the Wells Hydroelectric Project is described. Because the spillway and powerhouse are combined into a single structure in the unique Hydrocombine concept conceived for the Wells Project, the conventional fish passage facilities could not be directly used at the Wells Project. A fish attraction system was developed by using submerged high velocity water jets at each end of the Hydrocombine to provide an attraction flow across the downstream face of the Hydrocombine. The jet locations and jet flow were developed from hydraulic model tests of the Hydrocombine structure. Two staircase type fish ladders are provided for passage of fish over the Hydrocombine, one ladder located at each end of the Hydrocombine. An extensive fish spawning facility was constructed immediately downstream from the west embankment of the dam. Located in the west fish ladder is a sorting facility for diverting selected fish to the spawning channel. A 150-acre artificial pond for rearing steelhead trout is constructed in the Wells Reservoir.\",\"PeriodicalId\":136288,\"journal\":{\"name\":\"Journal of the Power Division\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1971-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Power Division\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/JPWEAM.0000656\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Power Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JPWEAM.0000656","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了韦尔斯水电工程鱼道及鱼类产卵设施的开发情况。由于溢洪道和厂房在Wells项目独特的Hydrocombine概念中被组合成一个单一的结构,传统的鱼类通道设施不能直接用于Wells项目。通过在水力联合收割机的两端使用水下高速水射流,开发了一种吸引鱼群的系统,通过水力联合收割机的下游表面提供吸引流。射流位置和射流流量是根据水力结合机结构的水力模型试验得出的。提供了两个楼梯式鱼梯,用于鱼在水力联合收割机上的通道,一个梯子位于水力联合收割机的每一端。在大坝西堤岸的下游立即建造了一个大规模的鱼类产卵设施。位于西部的鱼梯是一个分选设施,用于将选定的鱼类转移到产卵通道。在Wells水库建造了一个150英亩的人工池塘,用于养殖钢头鳟鱼。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Wells Hydroelectric Project Fish Facilities
The development of the fish passage and fish spawning facilities for the Wells Hydroelectric Project is described. Because the spillway and powerhouse are combined into a single structure in the unique Hydrocombine concept conceived for the Wells Project, the conventional fish passage facilities could not be directly used at the Wells Project. A fish attraction system was developed by using submerged high velocity water jets at each end of the Hydrocombine to provide an attraction flow across the downstream face of the Hydrocombine. The jet locations and jet flow were developed from hydraulic model tests of the Hydrocombine structure. Two staircase type fish ladders are provided for passage of fish over the Hydrocombine, one ladder located at each end of the Hydrocombine. An extensive fish spawning facility was constructed immediately downstream from the west embankment of the dam. Located in the west fish ladder is a sorting facility for diverting selected fish to the spawning channel. A 150-acre artificial pond for rearing steelhead trout is constructed in the Wells Reservoir.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信