在越南富国岛进行固体废物发电的可行性*

H. Nguyen, Viet-Cuong Vo, Vinh-Nghi Le, T. Phan, T. Tran
{"title":"在越南富国岛进行固体废物发电的可行性*","authors":"H. Nguyen, Viet-Cuong Vo, Vinh-Nghi Le, T. Phan, T. Tran","doi":"10.1109/GTSD.2018.8595552","DOIUrl":null,"url":null,"abstract":"Solid waste treatment, improving economic feasibility and improving the environment are urgent issues in Vietnam. Phu Quoc Island, the largest island in Vietnam, is expected to become a national center for ecotourism, recreation and entertainment, however the problem of solid wastes causing environmental pollution is very problematic and will have need the attention of society. The objective of this article is to study the feasibility of a solid waste generation solution for Phu Quoc, to demonstrate the economic and technical feasibility, based on the use of planning data generated for Phu Quoc in the period 2020-2030, environmental data in Vietnam, the application of the world’s technology$\\cdots$ The research results show that the potential for electricity generation from solid waste at Phu Quoc varies from 4.77.0 MW, the corresponding production cost from 6.4 to 5.3 cents/kWh. The project’s NPV can reach $5.1 million at a rate of 7%; The IRR project is 10.5%; The payback time of the capital is 13.01 years. The net profit margin and the return on investment were respectively 18.9% and 14.9% $\\cdots$ With this result, we can conclude that the project for the production of electricity from solid waste at Phu Quoc is a high feasibility should be applied in practice.","PeriodicalId":344653,"journal":{"name":"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)","volume":"293 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Feasibility for Solid Waste Power Generation at Phu Quoc Island, Vietnam*\",\"authors\":\"H. Nguyen, Viet-Cuong Vo, Vinh-Nghi Le, T. Phan, T. Tran\",\"doi\":\"10.1109/GTSD.2018.8595552\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Solid waste treatment, improving economic feasibility and improving the environment are urgent issues in Vietnam. Phu Quoc Island, the largest island in Vietnam, is expected to become a national center for ecotourism, recreation and entertainment, however the problem of solid wastes causing environmental pollution is very problematic and will have need the attention of society. The objective of this article is to study the feasibility of a solid waste generation solution for Phu Quoc, to demonstrate the economic and technical feasibility, based on the use of planning data generated for Phu Quoc in the period 2020-2030, environmental data in Vietnam, the application of the world’s technology$\\\\cdots$ The research results show that the potential for electricity generation from solid waste at Phu Quoc varies from 4.77.0 MW, the corresponding production cost from 6.4 to 5.3 cents/kWh. The project’s NPV can reach $5.1 million at a rate of 7%; The IRR project is 10.5%; The payback time of the capital is 13.01 years. The net profit margin and the return on investment were respectively 18.9% and 14.9% $\\\\cdots$ With this result, we can conclude that the project for the production of electricity from solid waste at Phu Quoc is a high feasibility should be applied in practice.\",\"PeriodicalId\":344653,\"journal\":{\"name\":\"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)\",\"volume\":\"293 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GTSD.2018.8595552\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GTSD.2018.8595552","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

固体废物处理、提高经济可行性和改善环境是越南迫切需要解决的问题。富国岛是越南最大的岛屿,有望成为国家生态旅游、休闲和娱乐中心,但固体废物造成的环境污染问题非常严重,需要引起社会的重视。本文的目的是研究富国岛固体废物发电解决方案的可行性,以经济和技术可行性为基础,利用2020-2030年期间为富国岛生成的规划数据,越南的环境数据,世界技术的应用。研究结果表明,富国岛固体废物发电的潜力从4.77.0 MW,相应的生产成本为6.4 ~ 5.3分/千瓦时。该项目的净现值可达到510万美元,利率为7%;项目内部收益率为10.5%;资金回收期为13.01年。净利润率和投资回报率分别为18.9%和14.9%,由此可以得出富国岛固体废物发电项目具有很高的可行性,值得在实践中应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Feasibility for Solid Waste Power Generation at Phu Quoc Island, Vietnam*
Solid waste treatment, improving economic feasibility and improving the environment are urgent issues in Vietnam. Phu Quoc Island, the largest island in Vietnam, is expected to become a national center for ecotourism, recreation and entertainment, however the problem of solid wastes causing environmental pollution is very problematic and will have need the attention of society. The objective of this article is to study the feasibility of a solid waste generation solution for Phu Quoc, to demonstrate the economic and technical feasibility, based on the use of planning data generated for Phu Quoc in the period 2020-2030, environmental data in Vietnam, the application of the world’s technology$\cdots$ The research results show that the potential for electricity generation from solid waste at Phu Quoc varies from 4.77.0 MW, the corresponding production cost from 6.4 to 5.3 cents/kWh. The project’s NPV can reach $5.1 million at a rate of 7%; The IRR project is 10.5%; The payback time of the capital is 13.01 years. The net profit margin and the return on investment were respectively 18.9% and 14.9% $\cdots$ With this result, we can conclude that the project for the production of electricity from solid waste at Phu Quoc is a high feasibility should be applied in practice.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信