{"title":"水电厂同步发电机设置过励磁继电保护分析","authors":"E. Alves, Marco Aurelio de Souza","doi":"10.1109/TDC-LA.2010.5762897","DOIUrl":null,"url":null,"abstract":"This paper seeks to revise the concepts related to the overexcitation relaying in synchronous generators for hydro power plants and its coordination with the V/Hz limiter of the automatic voltage regulator (AVR). The methodology for the ANSI 24 protection function set up in hydro power plants is revisited. Finally, problems faced during the commissioning of a power plant in Brazil is discussed.","PeriodicalId":222318,"journal":{"name":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Analysis of overexcitation relaying set up in synchronous generators for hydro power plants\",\"authors\":\"E. Alves, Marco Aurelio de Souza\",\"doi\":\"10.1109/TDC-LA.2010.5762897\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper seeks to revise the concepts related to the overexcitation relaying in synchronous generators for hydro power plants and its coordination with the V/Hz limiter of the automatic voltage regulator (AVR). The methodology for the ANSI 24 protection function set up in hydro power plants is revisited. Finally, problems faced during the commissioning of a power plant in Brazil is discussed.\",\"PeriodicalId\":222318,\"journal\":{\"name\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC-LA.2010.5762897\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2010.5762897","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis of overexcitation relaying set up in synchronous generators for hydro power plants
This paper seeks to revise the concepts related to the overexcitation relaying in synchronous generators for hydro power plants and its coordination with the V/Hz limiter of the automatic voltage regulator (AVR). The methodology for the ANSI 24 protection function set up in hydro power plants is revisited. Finally, problems faced during the commissioning of a power plant in Brazil is discussed.