{"title":"检讨5D-smeta计划的机会","authors":"M. E. Gorinsky","doi":"10.33920/str-01-2301-06","DOIUrl":null,"url":null,"abstract":"Any construction is impossible without the use of nonmetallic construction materials. At the same time the problems about the provision of construction with nonmetallic building materials arise at the transportation stage. Moreover, each type of transport has its specific problems. The essence of these problems is considered in the article. Dynamics of the market and logistics of nonmetallic construction materials is analysed. Measures, which are proposed by the experts for stabilization of a situation, with the transportation of nonmetallic materials are considered.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Review of the opportunities of 5D-smeta program\",\"authors\":\"M. E. Gorinsky\",\"doi\":\"10.33920/str-01-2301-06\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Any construction is impossible without the use of nonmetallic construction materials. At the same time the problems about the provision of construction with nonmetallic building materials arise at the transportation stage. Moreover, each type of transport has its specific problems. The essence of these problems is considered in the article. Dynamics of the market and logistics of nonmetallic construction materials is analysed. Measures, which are proposed by the experts for stabilization of a situation, with the transportation of nonmetallic materials are considered.\",\"PeriodicalId\":339141,\"journal\":{\"name\":\"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33920/str-01-2301-06\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2301-06","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Any construction is impossible without the use of nonmetallic construction materials. At the same time the problems about the provision of construction with nonmetallic building materials arise at the transportation stage. Moreover, each type of transport has its specific problems. The essence of these problems is considered in the article. Dynamics of the market and logistics of nonmetallic construction materials is analysed. Measures, which are proposed by the experts for stabilization of a situation, with the transportation of nonmetallic materials are considered.