{"title":"德国配电网的质量管理——实时工作的新动力","authors":"K. Dutsch","doi":"10.1109/ICOLIM.2014.6934390","DOIUrl":null,"url":null,"abstract":"With the introduction of Quality Regulation in German electricity distribution networks in 2012, interruptions of supply in medium and low voltage networks have had direct impact on the approved revenues for both the medium and large sized electricity network operators in Germany. Live Working can minimize planned interruptions of supply and is an important factor in meeting the quality requirements of the German Regulator (Bundesnetzagentur, BNA). It thereby avoids deduction from the individual network revenues. In this document, experiences of Bayernwerk AG - a distribution company of the E.ON Group in Germany - regarding the impacts of Quality Regulation on the profitability of Live Working are addressed. This includes the following: - Principles of the Quality Regulation as part of the Incentive Regulation in Germany - Influences on Live Working in low and medium voltage networks - Consequences and further developments.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"116 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Quality Regulation in German distribution networks - New impulse for Live Working\",\"authors\":\"K. Dutsch\",\"doi\":\"10.1109/ICOLIM.2014.6934390\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the introduction of Quality Regulation in German electricity distribution networks in 2012, interruptions of supply in medium and low voltage networks have had direct impact on the approved revenues for both the medium and large sized electricity network operators in Germany. Live Working can minimize planned interruptions of supply and is an important factor in meeting the quality requirements of the German Regulator (Bundesnetzagentur, BNA). It thereby avoids deduction from the individual network revenues. In this document, experiences of Bayernwerk AG - a distribution company of the E.ON Group in Germany - regarding the impacts of Quality Regulation on the profitability of Live Working are addressed. This includes the following: - Principles of the Quality Regulation as part of the Incentive Regulation in Germany - Influences on Live Working in low and medium voltage networks - Consequences and further developments.\",\"PeriodicalId\":238060,\"journal\":{\"name\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"volume\":\"116 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICOLIM.2014.6934390\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934390","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

随着2012年德国配电网络质量法规的引入,中低压电网的供应中断对德国大中型电网运营商的批准收入产生了直接影响。实时工作可以最大限度地减少计划的供应中断,是满足德国监管机构(Bundesnetzagentur, BNA)质量要求的重要因素。因此,它避免了从个人网络收入中扣除。在本文档中,介绍了德国意昂集团旗下分销公司Bayernwerk AG在质量法规对Live Working盈利能力的影响方面的经验。这包括以下内容:-作为德国激励法规一部分的质量法规原则-对低压和中压网络带电工作的影响-后果和进一步发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Quality Regulation in German distribution networks - New impulse for Live Working
With the introduction of Quality Regulation in German electricity distribution networks in 2012, interruptions of supply in medium and low voltage networks have had direct impact on the approved revenues for both the medium and large sized electricity network operators in Germany. Live Working can minimize planned interruptions of supply and is an important factor in meeting the quality requirements of the German Regulator (Bundesnetzagentur, BNA). It thereby avoids deduction from the individual network revenues. In this document, experiences of Bayernwerk AG - a distribution company of the E.ON Group in Germany - regarding the impacts of Quality Regulation on the profitability of Live Working are addressed. This includes the following: - Principles of the Quality Regulation as part of the Incentive Regulation in Germany - Influences on Live Working in low and medium voltage networks - Consequences and further developments.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信