D. Gransberg, H. D. Jeong, E. Craigie, J. Rueda-Benavides, K. Shrestha
{"title":"估算公路施工前服务成本。第一卷:旅游指南","authors":"D. Gransberg, H. D. Jeong, E. Craigie, J. Rueda-Benavides, K. Shrestha","doi":"10.17226/23590","DOIUrl":null,"url":null,"abstract":"This report presents guidance for state departments of transportation (DOTs) and other agencies for estimating pre-construction services (PCS) costs for transportation project development. PCS refers to a varied assortment of project-specific engineering and other professional services required before construction begins on a bridge, highway, or other transportation project, whether provided by agency staff or consultants. The guidance—a guidebook (Volume 1) and supporting research report (Volume 2)—addresses principal sources and components of PCS costs, PCS estimating methodologies, trends (such as changes in design and construction technology, design standards, program requirements, and professional workforce) likely to affect PCS costs, and advice on agency policies and practices that can help control program risk through improved PCS cost estimation.","PeriodicalId":350472,"journal":{"name":"NCHRP Report","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Estimating Highway Preconstruction Services Costs. Volume 1: Guidebook\",\"authors\":\"D. Gransberg, H. D. Jeong, E. Craigie, J. Rueda-Benavides, K. Shrestha\",\"doi\":\"10.17226/23590\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This report presents guidance for state departments of transportation (DOTs) and other agencies for estimating pre-construction services (PCS) costs for transportation project development. PCS refers to a varied assortment of project-specific engineering and other professional services required before construction begins on a bridge, highway, or other transportation project, whether provided by agency staff or consultants. The guidance—a guidebook (Volume 1) and supporting research report (Volume 2)—addresses principal sources and components of PCS costs, PCS estimating methodologies, trends (such as changes in design and construction technology, design standards, program requirements, and professional workforce) likely to affect PCS costs, and advice on agency policies and practices that can help control program risk through improved PCS cost estimation.\",\"PeriodicalId\":350472,\"journal\":{\"name\":\"NCHRP Report\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"NCHRP Report\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17226/23590\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"NCHRP Report","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17226/23590","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This report presents guidance for state departments of transportation (DOTs) and other agencies for estimating pre-construction services (PCS) costs for transportation project development. PCS refers to a varied assortment of project-specific engineering and other professional services required before construction begins on a bridge, highway, or other transportation project, whether provided by agency staff or consultants. The guidance—a guidebook (Volume 1) and supporting research report (Volume 2)—addresses principal sources and components of PCS costs, PCS estimating methodologies, trends (such as changes in design and construction technology, design standards, program requirements, and professional workforce) likely to affect PCS costs, and advice on agency policies and practices that can help control program risk through improved PCS cost estimation.