Theodore Kokkinis, C. R. Brinkmann, John Ding, D. Fenz
{"title":"北极深水开发钻井设计考虑","authors":"Theodore Kokkinis, C. R. Brinkmann, John Ding, D. Fenz","doi":"10.5957/icetech-2010-115","DOIUrl":null,"url":null,"abstract":"To produce hydrocarbons economically from an arctic deepwater discovery, development drilling operations will need to drill a large number of wells over a relatively short time span, leading to a requirement for year-round operations. Such a development drilling system would operate in some of the most severe winter ice conditions occurring in the arctic seas, combining available technology elements and balancing stationkeeping capability with ice management capability. Core design considerations are outlined, involving fabrication, transportation, installation, stationkeeping and disconnection issues, and the impacts of drilling and re-supply operations are assessed. Key technical challenges and associated research and technology development needs are identified.","PeriodicalId":408230,"journal":{"name":"Day 2 Tue, September 21, 2010","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Arctic Deepwater Development Drilling Design Considerations\",\"authors\":\"Theodore Kokkinis, C. R. Brinkmann, John Ding, D. Fenz\",\"doi\":\"10.5957/icetech-2010-115\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To produce hydrocarbons economically from an arctic deepwater discovery, development drilling operations will need to drill a large number of wells over a relatively short time span, leading to a requirement for year-round operations. Such a development drilling system would operate in some of the most severe winter ice conditions occurring in the arctic seas, combining available technology elements and balancing stationkeeping capability with ice management capability. Core design considerations are outlined, involving fabrication, transportation, installation, stationkeeping and disconnection issues, and the impacts of drilling and re-supply operations are assessed. Key technical challenges and associated research and technology development needs are identified.\",\"PeriodicalId\":408230,\"journal\":{\"name\":\"Day 2 Tue, September 21, 2010\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, September 21, 2010\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5957/icetech-2010-115\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, September 21, 2010","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5957/icetech-2010-115","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Arctic Deepwater Development Drilling Design Considerations
To produce hydrocarbons economically from an arctic deepwater discovery, development drilling operations will need to drill a large number of wells over a relatively short time span, leading to a requirement for year-round operations. Such a development drilling system would operate in some of the most severe winter ice conditions occurring in the arctic seas, combining available technology elements and balancing stationkeeping capability with ice management capability. Core design considerations are outlined, involving fabrication, transportation, installation, stationkeeping and disconnection issues, and the impacts of drilling and re-supply operations are assessed. Key technical challenges and associated research and technology development needs are identified.