北极深水开发钻井设计考虑

Theodore Kokkinis, C. R. Brinkmann, John Ding, D. Fenz
{"title":"北极深水开发钻井设计考虑","authors":"Theodore Kokkinis, C. R. Brinkmann, John Ding, D. Fenz","doi":"10.5957/icetech-2010-115","DOIUrl":null,"url":null,"abstract":"To produce hydrocarbons economically from an arctic deepwater discovery, development drilling operations will need to drill a large number of wells over a relatively short time span, leading to a requirement for year-round operations. Such a development drilling system would operate in some of the most severe winter ice conditions occurring in the arctic seas, combining available technology elements and balancing stationkeeping capability with ice management capability. Core design considerations are outlined, involving fabrication, transportation, installation, stationkeeping and disconnection issues, and the impacts of drilling and re-supply operations are assessed. Key technical challenges and associated research and technology development needs are identified.","PeriodicalId":408230,"journal":{"name":"Day 2 Tue, September 21, 2010","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Arctic Deepwater Development Drilling Design Considerations\",\"authors\":\"Theodore Kokkinis, C. R. Brinkmann, John Ding, D. Fenz\",\"doi\":\"10.5957/icetech-2010-115\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To produce hydrocarbons economically from an arctic deepwater discovery, development drilling operations will need to drill a large number of wells over a relatively short time span, leading to a requirement for year-round operations. Such a development drilling system would operate in some of the most severe winter ice conditions occurring in the arctic seas, combining available technology elements and balancing stationkeeping capability with ice management capability. Core design considerations are outlined, involving fabrication, transportation, installation, stationkeeping and disconnection issues, and the impacts of drilling and re-supply operations are assessed. Key technical challenges and associated research and technology development needs are identified.\",\"PeriodicalId\":408230,\"journal\":{\"name\":\"Day 2 Tue, September 21, 2010\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, September 21, 2010\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5957/icetech-2010-115\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, September 21, 2010","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5957/icetech-2010-115","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了从北极深水发现中经济地开采碳氢化合物,开发钻井作业将需要在相对较短的时间内钻大量的井,这就需要全年作业。这种开发钻井系统将在北极海域出现的一些最严重的冬季冰况下作业,结合现有的技术要素并平衡维持能力和冰管理能力。概述了核心设计考虑因素,包括制造、运输、安装、维护和断开问题,并评估了钻井和再供应作业的影响。确定了关键的技术挑战和相关的研究和技术开发需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Arctic Deepwater Development Drilling Design Considerations
To produce hydrocarbons economically from an arctic deepwater discovery, development drilling operations will need to drill a large number of wells over a relatively short time span, leading to a requirement for year-round operations. Such a development drilling system would operate in some of the most severe winter ice conditions occurring in the arctic seas, combining available technology elements and balancing stationkeeping capability with ice management capability. Core design considerations are outlined, involving fabrication, transportation, installation, stationkeeping and disconnection issues, and the impacts of drilling and re-supply operations are assessed. Key technical challenges and associated research and technology development needs are identified.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信