Shengwei Ding, J. Yi, M. Zhang, Raha Akhavan-Tabatabaei
{"title":"具有过程时间不确定性的多集群工具性能评估与调度优化","authors":"Shengwei Ding, J. Yi, M. Zhang, Raha Akhavan-Tabatabaei","doi":"10.1109/COASE.2006.326864","DOIUrl":null,"url":null,"abstract":"Performance evaluation and schedule optimization of cluster tools is challenging, especially when the process times are with uncertainty. In this paper, the critical path method (CPM) is used to analyze the throughput of multi-cluster tools with fixed action sequence. Slacks of non-critical path actions are studied and integrated to find the average cycle time of the cluster tool. A thin film tool from Novellus is used as an example to explain this methodology","PeriodicalId":116108,"journal":{"name":"2006 IEEE International Conference on Automation Science and Engineering","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty\",\"authors\":\"Shengwei Ding, J. Yi, M. Zhang, Raha Akhavan-Tabatabaei\",\"doi\":\"10.1109/COASE.2006.326864\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Performance evaluation and schedule optimization of cluster tools is challenging, especially when the process times are with uncertainty. In this paper, the critical path method (CPM) is used to analyze the throughput of multi-cluster tools with fixed action sequence. Slacks of non-critical path actions are studied and integrated to find the average cycle time of the cluster tool. A thin film tool from Novellus is used as an example to explain this methodology\",\"PeriodicalId\":116108,\"journal\":{\"name\":\"2006 IEEE International Conference on Automation Science and Engineering\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE International Conference on Automation Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/COASE.2006.326864\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Conference on Automation Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2006.326864","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty
Performance evaluation and schedule optimization of cluster tools is challenging, especially when the process times are with uncertainty. In this paper, the critical path method (CPM) is used to analyze the throughput of multi-cluster tools with fixed action sequence. Slacks of non-critical path actions are studied and integrated to find the average cycle time of the cluster tool. A thin film tool from Novellus is used as an example to explain this methodology