Zhou Wan, Gao Jie, He Ming, Luo Rongsen, He Rui, Li Yi
{"title":"新一代调度自动化系统中集装箱扩展方法分析","authors":"Zhou Wan, Gao Jie, He Ming, Luo Rongsen, He Rui, Li Yi","doi":"10.1109/AEEES54426.2022.9759722","DOIUrl":null,"url":null,"abstract":"Cluster control and management means still remain at the semi-automatic level for new generation of dispatch automation system, need a lot of human resources for long-term maintenance, monitor and control for cluster status is limited. With the transformation of China's new energy, the number of grid randomness and fragmented services will significantly increase. It is particularly important for cluster configuration and management in dispatching automation system. Based on simulation cluster that is established by Sichuan Province dispatching automation system, this paper proposes an optimization scheme for container automatic scaling which is available for “container + probe + comprehensive judgment” of complex scheduling system, and simulation test that is targeted at the influencing factor of scaling is done. The container cluster scaling scheme is formed for multi-source heterogeneous information collection.","PeriodicalId":252797,"journal":{"name":"2022 4th Asia Energy and Electrical Engineering Symposium (AEEES)","volume":"283 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Container Expansion Method in New Generation of Dispatch Automation System\",\"authors\":\"Zhou Wan, Gao Jie, He Ming, Luo Rongsen, He Rui, Li Yi\",\"doi\":\"10.1109/AEEES54426.2022.9759722\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cluster control and management means still remain at the semi-automatic level for new generation of dispatch automation system, need a lot of human resources for long-term maintenance, monitor and control for cluster status is limited. With the transformation of China's new energy, the number of grid randomness and fragmented services will significantly increase. It is particularly important for cluster configuration and management in dispatching automation system. Based on simulation cluster that is established by Sichuan Province dispatching automation system, this paper proposes an optimization scheme for container automatic scaling which is available for “container + probe + comprehensive judgment” of complex scheduling system, and simulation test that is targeted at the influencing factor of scaling is done. The container cluster scaling scheme is formed for multi-source heterogeneous information collection.\",\"PeriodicalId\":252797,\"journal\":{\"name\":\"2022 4th Asia Energy and Electrical Engineering Symposium (AEEES)\",\"volume\":\"283 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 4th Asia Energy and Electrical Engineering Symposium (AEEES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AEEES54426.2022.9759722\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 4th Asia Energy and Electrical Engineering Symposium (AEEES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEEES54426.2022.9759722","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis of Container Expansion Method in New Generation of Dispatch Automation System
Cluster control and management means still remain at the semi-automatic level for new generation of dispatch automation system, need a lot of human resources for long-term maintenance, monitor and control for cluster status is limited. With the transformation of China's new energy, the number of grid randomness and fragmented services will significantly increase. It is particularly important for cluster configuration and management in dispatching automation system. Based on simulation cluster that is established by Sichuan Province dispatching automation system, this paper proposes an optimization scheme for container automatic scaling which is available for “container + probe + comprehensive judgment” of complex scheduling system, and simulation test that is targeted at the influencing factor of scaling is done. The container cluster scaling scheme is formed for multi-source heterogeneous information collection.