模糊时间成本权衡问题的依赖机会规划模型

Hua Ke, Weimin Ma
{"title":"模糊时间成本权衡问题的依赖机会规划模型","authors":"Hua Ke, Weimin Ma","doi":"10.1109/FUZZY.2009.5277068","DOIUrl":null,"url":null,"abstract":"In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.","PeriodicalId":117895,"journal":{"name":"2009 IEEE International Conference on Fuzzy Systems","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A dependent-chance programming model for fuzzy time-cost trade-off problem\",\"authors\":\"Hua Ke, Weimin Ma\",\"doi\":\"10.1109/FUZZY.2009.5277068\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.\",\"PeriodicalId\":117895,\"journal\":{\"name\":\"2009 IEEE International Conference on Fuzzy Systems\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-10-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE International Conference on Fuzzy Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FUZZY.2009.5277068\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE International Conference on Fuzzy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUZZY.2009.5277068","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在实际项目中,项目成本与项目完成时间之间的权衡以及环境的不确定性都是决策者需要考虑的问题。然而,对时间成本权衡问题的研究很少涉及模糊环境。本文提出了一种基于依赖机会规划思想的模糊时间成本权衡模型,该模型利用可信性理论来描述活动持续时间的不确定性。提出了一种将模糊仿真和遗传算法相结合的混合智能算法来搜索给定决策规则下的最优调度方案。本文的目的是揭示在模糊环境下如何获得项目完工时间和项目成本的最优平衡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A dependent-chance programming model for fuzzy time-cost trade-off problem
In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信