{"title":"模糊时间成本权衡问题的依赖机会规划模型","authors":"Hua Ke, Weimin Ma","doi":"10.1109/FUZZY.2009.5277068","DOIUrl":null,"url":null,"abstract":"In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.","PeriodicalId":117895,"journal":{"name":"2009 IEEE International Conference on Fuzzy Systems","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A dependent-chance programming model for fuzzy time-cost trade-off problem\",\"authors\":\"Hua Ke, Weimin Ma\",\"doi\":\"10.1109/FUZZY.2009.5277068\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.\",\"PeriodicalId\":117895,\"journal\":{\"name\":\"2009 IEEE International Conference on Fuzzy Systems\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-10-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE International Conference on Fuzzy Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FUZZY.2009.5277068\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE International Conference on Fuzzy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUZZY.2009.5277068","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A dependent-chance programming model for fuzzy time-cost trade-off problem
In real projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. However, the research on the time-cost tradeoff problem seldom concerns fuzzy environments. In this paper, a new fuzzy time-cost trade-off model with the philosophy of dependent-chance programming is proposed, in which credibility theory is applied to describe the uncertainty of activity durations. A searching method as a hybrid intelligent algorithm integrating fuzzy simulation and genetic algorithm is produced to search the optimal schedule under the given decision-making rule. The purpose of the paper is to reveal how to obtain the optimal balance of the project completion time and the project cost in fuzzy environment.