超高拱坝监测数据的智能分析与决策

Jianming Wu, Yu Hu, Dan-mei Xu, Yaosheng Tan, Chunfeng Liu, Lei Pei, Zhuo Li
{"title":"超高拱坝监测数据的智能分析与决策","authors":"Jianming Wu, Yu Hu, Dan-mei Xu, Yaosheng Tan, Chunfeng Liu, Lei Pei, Zhuo Li","doi":"10.1109/ISPDS56360.2022.9874087","DOIUrl":null,"url":null,"abstract":"Intelligent construction in the process of application of extra-high arch dams, a large number of monitoring instruments buried inside the project during the construction process, reasonable use of good monitoring data to promote the construction of seamless dams, has important research significance. Monitoring data can sense the true state of the dam in all aspects and improve engineering guidance. In this paper, through the current stage of monitoring data of the extra-high arch dam, the objective, continuity, timeliness, accuracy and dynamics of the monitoring data, the visualization of the seepage, temperature and stress field monitoring data of the extra-high arch dam, the whole process analysis, and the application of monitoring data to provide comprehensive feedback on the construction process are conducive to promoting the progress of the design and construction of the extra-high arch dam, and promoting the construction of the extra-high arch dam with higher quality.","PeriodicalId":280244,"journal":{"name":"2022 3rd International Conference on Information Science, Parallel and Distributed Systems (ISPDS)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Intelligent analysis and decision making for monitoring data of ultra-high arch dams\",\"authors\":\"Jianming Wu, Yu Hu, Dan-mei Xu, Yaosheng Tan, Chunfeng Liu, Lei Pei, Zhuo Li\",\"doi\":\"10.1109/ISPDS56360.2022.9874087\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Intelligent construction in the process of application of extra-high arch dams, a large number of monitoring instruments buried inside the project during the construction process, reasonable use of good monitoring data to promote the construction of seamless dams, has important research significance. Monitoring data can sense the true state of the dam in all aspects and improve engineering guidance. In this paper, through the current stage of monitoring data of the extra-high arch dam, the objective, continuity, timeliness, accuracy and dynamics of the monitoring data, the visualization of the seepage, temperature and stress field monitoring data of the extra-high arch dam, the whole process analysis, and the application of monitoring data to provide comprehensive feedback on the construction process are conducive to promoting the progress of the design and construction of the extra-high arch dam, and promoting the construction of the extra-high arch dam with higher quality.\",\"PeriodicalId\":280244,\"journal\":{\"name\":\"2022 3rd International Conference on Information Science, Parallel and Distributed Systems (ISPDS)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 3rd International Conference on Information Science, Parallel and Distributed Systems (ISPDS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPDS56360.2022.9874087\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 3rd International Conference on Information Science, Parallel and Distributed Systems (ISPDS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPDS56360.2022.9874087","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

智能施工在超高拱坝施工过程中的应用,在工程施工过程中埋设大量的监测仪器,合理利用良好的监测数据,对推进无缝坝的施工,具有重要的研究意义。监测数据可以感知大坝各方面的真实状态,提高工程指导水平。本文通过对特高拱坝现阶段监测数据的分析,对监测数据的客观性、连续性、及时性、准确性和动态性,对特高拱坝渗流、温度和应力场监测数据的可视化,进行全过程分析,而应用监测数据对施工过程进行全面的反馈,有利于推动超高层拱坝的设计和施工进度,促进超高层拱坝以更高的质量施工。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Intelligent analysis and decision making for monitoring data of ultra-high arch dams
Intelligent construction in the process of application of extra-high arch dams, a large number of monitoring instruments buried inside the project during the construction process, reasonable use of good monitoring data to promote the construction of seamless dams, has important research significance. Monitoring data can sense the true state of the dam in all aspects and improve engineering guidance. In this paper, through the current stage of monitoring data of the extra-high arch dam, the objective, continuity, timeliness, accuracy and dynamics of the monitoring data, the visualization of the seepage, temperature and stress field monitoring data of the extra-high arch dam, the whole process analysis, and the application of monitoring data to provide comprehensive feedback on the construction process are conducive to promoting the progress of the design and construction of the extra-high arch dam, and promoting the construction of the extra-high arch dam with higher quality.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信