{"title":"一种将可控因素与不可控因素相结合进行项目比较的概念性方法","authors":"S. F. Sujan, E. Hjelseth","doi":"10.1201/9781003191476-66","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":154522,"journal":{"name":"ECPPM 2021 – eWork and eBusiness in Architecture, Engineering and Construction","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A conceptual method to compare projects by combining assessment of controllable and non-controllable factors\",\"authors\":\"S. F. Sujan, E. Hjelseth\",\"doi\":\"10.1201/9781003191476-66\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":154522,\"journal\":{\"name\":\"ECPPM 2021 – eWork and eBusiness in Architecture, Engineering and Construction\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ECPPM 2021 – eWork and eBusiness in Architecture, Engineering and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/9781003191476-66\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ECPPM 2021 – eWork and eBusiness in Architecture, Engineering and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003191476-66","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}