{"title":"塞尔维亚共和国x走廊公路建设期间土壤质量监测","authors":"I. Jokanović, Milica Pavić, M. Despotovic","doi":"10.35123/geo-expo_2021_4","DOIUrl":null,"url":null,"abstract":"Soil pollution during the road construction phase is mainly a consequence of multiple processes, but most often the main causes are carelessness, negligence and incidental situations of spillage of harmful substances. At the same time, pollution most often occurs in a relatively narrow zone of the construction site, as well as along access roads. For the purpose of completing the highway on the southern and south-eastern branch of Corridor X in the Republic of Serbia, an extensive program of protection and monitoring of various environmental parameters has been made, which, among other things, included soil quality. During the multi-year implementation, a large amount of results was collected on the basis of which it is possible to make certain analyses and conclusions regarding the organization of the contractor’s work, implementation of mitigation measures, as well as the consequences that occurred during the works.","PeriodicalId":115267,"journal":{"name":"ZBORNIK RADOVA GEO-EXPO 2021","volume":"141 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"MONITORING OF SOIL QUALITY DURING THE CONSTRUCTION OF THE HIGHWAY ON CORRIDOR X IN THE REPUBLIC OF SERBIA\",\"authors\":\"I. Jokanović, Milica Pavić, M. Despotovic\",\"doi\":\"10.35123/geo-expo_2021_4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Soil pollution during the road construction phase is mainly a consequence of multiple processes, but most often the main causes are carelessness, negligence and incidental situations of spillage of harmful substances. At the same time, pollution most often occurs in a relatively narrow zone of the construction site, as well as along access roads. For the purpose of completing the highway on the southern and south-eastern branch of Corridor X in the Republic of Serbia, an extensive program of protection and monitoring of various environmental parameters has been made, which, among other things, included soil quality. During the multi-year implementation, a large amount of results was collected on the basis of which it is possible to make certain analyses and conclusions regarding the organization of the contractor’s work, implementation of mitigation measures, as well as the consequences that occurred during the works.\",\"PeriodicalId\":115267,\"journal\":{\"name\":\"ZBORNIK RADOVA GEO-EXPO 2021\",\"volume\":\"141 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ZBORNIK RADOVA GEO-EXPO 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35123/geo-expo_2021_4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ZBORNIK RADOVA GEO-EXPO 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35123/geo-expo_2021_4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

道路施工阶段的土壤污染主要是多种过程的结果,但最常见的主要原因是粗心、疏忽和有害物质泄漏的偶然情况。与此同时,污染通常发生在施工现场相对狭窄的区域以及通道沿线。为了完成塞尔维亚共和国境内X走廊南部和东南部分支的高速公路,制定了一项广泛的保护和监测各种环境参数的方案,其中除其他外,包括土壤质量。在多年的实施过程中,收集了大量结果,在此基础上,可以对承包商的工作组织、缓解措施的实施以及工程期间发生的后果作出某些分析和结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
MONITORING OF SOIL QUALITY DURING THE CONSTRUCTION OF THE HIGHWAY ON CORRIDOR X IN THE REPUBLIC OF SERBIA
Soil pollution during the road construction phase is mainly a consequence of multiple processes, but most often the main causes are carelessness, negligence and incidental situations of spillage of harmful substances. At the same time, pollution most often occurs in a relatively narrow zone of the construction site, as well as along access roads. For the purpose of completing the highway on the southern and south-eastern branch of Corridor X in the Republic of Serbia, an extensive program of protection and monitoring of various environmental parameters has been made, which, among other things, included soil quality. During the multi-year implementation, a large amount of results was collected on the basis of which it is possible to make certain analyses and conclusions regarding the organization of the contractor’s work, implementation of mitigation measures, as well as the consequences that occurred during the works.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信