确定PLC/BPL应用和商业化的一些技术经济标准

P. A. Brown
{"title":"确定PLC/BPL应用和商业化的一些技术经济标准","authors":"P. A. Brown","doi":"10.1109/ISPLC.2005.1430504","DOIUrl":null,"url":null,"abstract":"The development of first-pass simplified business models for power line communication (PLC) systems is necessary in order to provide an early focus on the key technical and financial criteria by which investment and the return on investment (ROI) might be considered. For example, PC based spreadsheet modeling provides a useful mathematical tool for identifying sensitivities in the broadband power line (BPL) business cases by enabling rapid comparisons between electrical distribution network (EDN) technical parameters, BPL equipment specifications, system features and customer expectations. It is important for both developers and investors to understand the technical challenges and business opportunities offered by PLC.","PeriodicalId":153251,"journal":{"name":"International Symposium on Power Line Communications and Its Applications, 2005.","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Identifying some techno-economic criteria in PLC/BPL applications and commercialization\",\"authors\":\"P. A. Brown\",\"doi\":\"10.1109/ISPLC.2005.1430504\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of first-pass simplified business models for power line communication (PLC) systems is necessary in order to provide an early focus on the key technical and financial criteria by which investment and the return on investment (ROI) might be considered. For example, PC based spreadsheet modeling provides a useful mathematical tool for identifying sensitivities in the broadband power line (BPL) business cases by enabling rapid comparisons between electrical distribution network (EDN) technical parameters, BPL equipment specifications, system features and customer expectations. It is important for both developers and investors to understand the technical challenges and business opportunities offered by PLC.\",\"PeriodicalId\":153251,\"journal\":{\"name\":\"International Symposium on Power Line Communications and Its Applications, 2005.\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium on Power Line Communications and Its Applications, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPLC.2005.1430504\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Power Line Communications and Its Applications, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPLC.2005.1430504","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

电力线通信(PLC)系统的首通简化业务模型的开发是必要的,以便提供对关键技术和财务标准的早期关注,这些标准可以考虑投资和投资回报(ROI)。例如,基于PC的电子表格建模提供了一个有用的数学工具,可以通过快速比较配电网络(EDN)技术参数、BPL设备规格、系统功能和客户期望,来识别宽带电力线(BPL)业务案例中的敏感性。对于开发商和投资者来说,了解PLC提供的技术挑战和商业机会是很重要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Identifying some techno-economic criteria in PLC/BPL applications and commercialization
The development of first-pass simplified business models for power line communication (PLC) systems is necessary in order to provide an early focus on the key technical and financial criteria by which investment and the return on investment (ROI) might be considered. For example, PC based spreadsheet modeling provides a useful mathematical tool for identifying sensitivities in the broadband power line (BPL) business cases by enabling rapid comparisons between electrical distribution network (EDN) technical parameters, BPL equipment specifications, system features and customer expectations. It is important for both developers and investors to understand the technical challenges and business opportunities offered by PLC.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信