Martin Jedinák, Stanislav Prieložný, F. Janiček, Juraj Kubica
{"title":"作为补救行动的跨界重新派遣及其执行的各个方面","authors":"Martin Jedinák, Stanislav Prieložný, F. Janiček, Juraj Kubica","doi":"10.1109/ELEKTRO.2016.7512086","DOIUrl":null,"url":null,"abstract":"Transmission system operators deal with situations when their system does not comply with N-1 criterion on daily basis. Remedial actions are any actions which the transmission system operator implements in due time to avert a critical situation. During the year some transmission elements reach the Maximum Permanent Current Loading, a situation which is unacceptable for the safety and reliable operation of the system. After exhausting of all non-cost possible actions it is necessary to consider the measures of market-technical kind, so called redispatch. Anticipated legislative changes, whether at European, national or internal level will extend system operator's possibilities of facing and managing a critical situation.","PeriodicalId":369251,"journal":{"name":"2016 ELEKTRO","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Cross-border redispatch as the remedial action and aspects of its implementation\",\"authors\":\"Martin Jedinák, Stanislav Prieložný, F. Janiček, Juraj Kubica\",\"doi\":\"10.1109/ELEKTRO.2016.7512086\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transmission system operators deal with situations when their system does not comply with N-1 criterion on daily basis. Remedial actions are any actions which the transmission system operator implements in due time to avert a critical situation. During the year some transmission elements reach the Maximum Permanent Current Loading, a situation which is unacceptable for the safety and reliable operation of the system. After exhausting of all non-cost possible actions it is necessary to consider the measures of market-technical kind, so called redispatch. Anticipated legislative changes, whether at European, national or internal level will extend system operator's possibilities of facing and managing a critical situation.\",\"PeriodicalId\":369251,\"journal\":{\"name\":\"2016 ELEKTRO\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 ELEKTRO\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ELEKTRO.2016.7512086\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 ELEKTRO","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELEKTRO.2016.7512086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Cross-border redispatch as the remedial action and aspects of its implementation
Transmission system operators deal with situations when their system does not comply with N-1 criterion on daily basis. Remedial actions are any actions which the transmission system operator implements in due time to avert a critical situation. During the year some transmission elements reach the Maximum Permanent Current Loading, a situation which is unacceptable for the safety and reliable operation of the system. After exhausting of all non-cost possible actions it is necessary to consider the measures of market-technical kind, so called redispatch. Anticipated legislative changes, whether at European, national or internal level will extend system operator's possibilities of facing and managing a critical situation.