Tenty Tamara Andriani, F. Sarie, S. Gandi
{"title":"Analisis Daya Dukung Fondasi Bored Pile Pada Rumah Sakit Sultan Imanuddin Pangkalan Bun","authors":"Tenty Tamara Andriani, F. Sarie, S. Gandi","doi":"10.33084/mits.v11i2.4393","DOIUrl":null,"url":null,"abstract":"This study intended to analyze the bearing capacity of single bored pile, the bearing capacity of the bored pile group, the load carried, the safety factor, and the settlement that occurs. The first calculation method is Schmertmann and Nottingham method, and the second calculation method is Meyerhof method. Based on the calculation of the bearing capacity of a single bored pile using the Schmertmann and Nottingham method obtained a value Qu = 49005,88 kN, while the Meyerhof method obtained a value Qu = 1633.71 kN. The calculation results for bearing capacity of the pile group using the Schmertmann and Nottingham method obtained a value Qg = 164169,70 kN and the Meyerhof method obtained a value Qg = 5472.93 kN. The results of the load carried by the bored pile group using Schmertmann and Nottingham method is Qi = 353.98 kN ≤ Qg = 164169.70 kN which means it’s still within safe limits. Using the Meyerhof method is Qi = 353.98 kN ≤ Qg = 5472.93 kN which means it is still within safe limits. The safety factor using the Schmertmann and Nottingham method obtained SF = 463.78 and using the Meyerhof method obtained SF = 15.46 which means it is very safe. Total settlement of a single bored pile is S = 0.0142 m ≤ 0.04 m which means it is safe. And the settlement of the bored pile group is Sg = 0.03 m ≤ 0.08 m which also means it is safe","PeriodicalId":380506,"journal":{"name":"Media Ilmiah Teknik Sipil","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Ilmiah Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33084/mits.v11i2.4393","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究拟分析钻孔灌注桩的单桩承载力、钻孔灌注桩群的承载力、所承受的荷载、安全系数、发生的沉降。第一种计算方法是Schmertmann和Nottingham法,第二种计算方法是Meyerhof法。采用Schmertmann - Nottingham法对单桩承载力进行计算,得到Qu = 49005.88 kN, Meyerhof法得到Qu = 1633.71 kN。采用Schmertmann法和Nottingham法计算群桩承载力的结果为Qg = 164169,70 kN, Meyerhof法计算群桩承载力的结果为Qg = 5472.93 kN。采用Schmertmann - Nottingham法计算钻孔灌注桩群所受荷载为Qi = 353.98 kN≤Qg = 164169.70 kN,仍在安全范围内。Meyerhof法表示Qi = 353.98 kN≤Qg = 5472.93 kN,即仍在安全范围内。采用Schmertmann和Nottingham法得到的安全系数SF = 463.78,采用Meyerhof法得到的安全系数SF = 15.46,这意味着非常安全。单桩总沉降S = 0.0142 m≤0.04 m,安全。钻孔灌注桩群沉降Sg = 0.03 m≤0.08 m,也是安全的
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Daya Dukung Fondasi Bored Pile Pada Rumah Sakit Sultan Imanuddin Pangkalan Bun
This study intended to analyze the bearing capacity of single bored pile, the bearing capacity of the bored pile group, the load carried, the safety factor, and the settlement that occurs. The first calculation method is Schmertmann and Nottingham method, and the second calculation method is Meyerhof method. Based on the calculation of the bearing capacity of a single bored pile using the Schmertmann and Nottingham method obtained a value Qu = 49005,88 kN, while the Meyerhof method obtained a value Qu = 1633.71 kN. The calculation results for bearing capacity of the pile group using the Schmertmann and Nottingham method obtained a value Qg = 164169,70 kN and the Meyerhof method obtained a value Qg = 5472.93 kN. The results of the load carried by the bored pile group using Schmertmann and Nottingham method is Qi = 353.98 kN ≤ Qg = 164169.70 kN which means it’s still within safe limits. Using the Meyerhof method is Qi = 353.98 kN ≤ Qg = 5472.93 kN which means it is still within safe limits. The safety factor using the Schmertmann and Nottingham method obtained SF = 463.78 and using the Meyerhof method obtained SF = 15.46 which means it is very safe. Total settlement of a single bored pile is S = 0.0142 m ≤ 0.04 m which means it is safe. And the settlement of the bored pile group is Sg = 0.03 m ≤ 0.08 m which also means it is safe
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信