广域应用协调标准的选择、实施和克服挑战

Naveen Ganta, Lalit Ghatpande, Joe Perez
{"title":"广域应用协调标准的选择、实施和克服挑战","authors":"Naveen Ganta, Lalit Ghatpande, Joe Perez","doi":"10.1109/CPRE48231.2021.9429831","DOIUrl":null,"url":null,"abstract":"There is an increasing demand for utilities to define a relay settings process and check relay coordination which is driven by regulatory requirements such as the North American Electric Reliability Corporation (NERC) PRC-027-1 standard. Developing apt criteria to address all the pertaining elements requiring coordination is a crucial phase in performing any Wide Area Coordination (WAC) study. This paper discusses the methods to come up with coordination criteria by taking different scenarios and system configurations into consideration. This paper also reviews various challenges that may arise when implementing the adopted coordination criteria. Recommendations to overcome those challenges are also presented in this paper. Recommendations presented in this paper would be of help to utilities and consultants in avoiding issues when enforcing the determined coordination criteria.","PeriodicalId":405115,"journal":{"name":"2021 74th Conference for Protective Relay Engineers (CPRE)","volume":"440 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Selecting, Implementing and Overcoming Challenges when Selecting Coordination Criteria for Wide Area Applications\",\"authors\":\"Naveen Ganta, Lalit Ghatpande, Joe Perez\",\"doi\":\"10.1109/CPRE48231.2021.9429831\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There is an increasing demand for utilities to define a relay settings process and check relay coordination which is driven by regulatory requirements such as the North American Electric Reliability Corporation (NERC) PRC-027-1 standard. Developing apt criteria to address all the pertaining elements requiring coordination is a crucial phase in performing any Wide Area Coordination (WAC) study. This paper discusses the methods to come up with coordination criteria by taking different scenarios and system configurations into consideration. This paper also reviews various challenges that may arise when implementing the adopted coordination criteria. Recommendations to overcome those challenges are also presented in this paper. Recommendations presented in this paper would be of help to utilities and consultants in avoiding issues when enforcing the determined coordination criteria.\",\"PeriodicalId\":405115,\"journal\":{\"name\":\"2021 74th Conference for Protective Relay Engineers (CPRE)\",\"volume\":\"440 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 74th Conference for Protective Relay Engineers (CPRE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE48231.2021.9429831\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 74th Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE48231.2021.9429831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

对于公用事业公司来说,定义继电器设置过程和检查继电器协调的需求越来越大,这是由监管要求驱动的,如北美电力可靠性公司(NERC) PRC-027-1标准。在进行任何广域协调(WAC)研究时,制定适当的标准来处理需要协调的所有相关因素是一个关键阶段。本文讨论了在考虑不同场景和系统配置的情况下提出协调准则的方法。本文还回顾了在实施所采用的协调标准时可能出现的各种挑战。本文还提出了克服这些挑战的建议。本文提出的建议将有助于公用事业和顾问在执行确定的协调标准时避免出现问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Selecting, Implementing and Overcoming Challenges when Selecting Coordination Criteria for Wide Area Applications
There is an increasing demand for utilities to define a relay settings process and check relay coordination which is driven by regulatory requirements such as the North American Electric Reliability Corporation (NERC) PRC-027-1 standard. Developing apt criteria to address all the pertaining elements requiring coordination is a crucial phase in performing any Wide Area Coordination (WAC) study. This paper discusses the methods to come up with coordination criteria by taking different scenarios and system configurations into consideration. This paper also reviews various challenges that may arise when implementing the adopted coordination criteria. Recommendations to overcome those challenges are also presented in this paper. Recommendations presented in this paper would be of help to utilities and consultants in avoiding issues when enforcing the determined coordination criteria.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信