Naukhaiz Chaudhry, Misheal Ayaz, Dr Khalil-ur-Rehman Wahla, Dr Muhammad Usman
{"title":"通过验证性因素分析探讨项目计划与项目按时完成之间的关系","authors":"Naukhaiz Chaudhry, Misheal Ayaz, Dr Khalil-ur-Rehman Wahla, Dr Muhammad Usman","doi":"10.29145/eer.52.01","DOIUrl":null,"url":null,"abstract":"Real estate market and housing projects play a vital role in the economy of Pakistan. This study has been conducted with an aim to explore the relationship between project planning factors & on-time completion of real estate projects in Pakistan. Sample data comprised of 440 observations was collected through structured questionnaire from contractors, managers, engineers and supervisors related to construction projects. Confirmatory Factor Analysis has been used along with validity and reliability tests to conclude the significant factors. Through binary logistics regression, study concluded that various internal & external factors like “contractor related causes”, “material, labor and equipment related causes” and “contract relationships related causes” have significant impact on timely completion of the project.","PeriodicalId":149171,"journal":{"name":"Empirical Economic Review","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Exploring the Relationship between Project Planning and Timely Completion of a Project through Confirmatory Factor Analysis\",\"authors\":\"Naukhaiz Chaudhry, Misheal Ayaz, Dr Khalil-ur-Rehman Wahla, Dr Muhammad Usman\",\"doi\":\"10.29145/eer.52.01\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Real estate market and housing projects play a vital role in the economy of Pakistan. This study has been conducted with an aim to explore the relationship between project planning factors & on-time completion of real estate projects in Pakistan. Sample data comprised of 440 observations was collected through structured questionnaire from contractors, managers, engineers and supervisors related to construction projects. Confirmatory Factor Analysis has been used along with validity and reliability tests to conclude the significant factors. Through binary logistics regression, study concluded that various internal & external factors like “contractor related causes”, “material, labor and equipment related causes” and “contract relationships related causes” have significant impact on timely completion of the project.\",\"PeriodicalId\":149171,\"journal\":{\"name\":\"Empirical Economic Review\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Empirical Economic Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29145/eer.52.01\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Empirical Economic Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29145/eer.52.01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Exploring the Relationship between Project Planning and Timely Completion of a Project through Confirmatory Factor Analysis
Real estate market and housing projects play a vital role in the economy of Pakistan. This study has been conducted with an aim to explore the relationship between project planning factors & on-time completion of real estate projects in Pakistan. Sample data comprised of 440 observations was collected through structured questionnaire from contractors, managers, engineers and supervisors related to construction projects. Confirmatory Factor Analysis has been used along with validity and reliability tests to conclude the significant factors. Through binary logistics regression, study concluded that various internal & external factors like “contractor related causes”, “material, labor and equipment related causes” and “contract relationships related causes” have significant impact on timely completion of the project.