共享晶圆厂支持方法

M. Breeze, J. Davies
{"title":"共享晶圆厂支持方法","authors":"M. Breeze, J. Davies","doi":"10.1109/ASMC.1995.484388","DOIUrl":null,"url":null,"abstract":"For many years industry gurus have been urging closer links between suppliers and customers. At the Intel Fab 10 facility in Ireland, we believe this concept has been taken further than ever before in the semiconductor industry, via the Supplier Support Program. Intel's Fab 10 facility does not follow the traditional Fab support structure, in that it has substituted supplier personnel to carry out the equipment engineering functions. The performance of the overall system in expediting the turn on of Intel's billion dollar Pentium fab is discussed with respect to factory ramp time, the changing phases of the program and the consequences and expectations on line yield and die yield.","PeriodicalId":237741,"journal":{"name":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","volume":"75 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A shared approach to wafer fab support\",\"authors\":\"M. Breeze, J. Davies\",\"doi\":\"10.1109/ASMC.1995.484388\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For many years industry gurus have been urging closer links between suppliers and customers. At the Intel Fab 10 facility in Ireland, we believe this concept has been taken further than ever before in the semiconductor industry, via the Supplier Support Program. Intel's Fab 10 facility does not follow the traditional Fab support structure, in that it has substituted supplier personnel to carry out the equipment engineering functions. The performance of the overall system in expediting the turn on of Intel's billion dollar Pentium fab is discussed with respect to factory ramp time, the changing phases of the program and the consequences and expectations on line yield and die yield.\",\"PeriodicalId\":237741,\"journal\":{\"name\":\"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop\",\"volume\":\"75 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-11-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.1995.484388\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.1995.484388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

多年来,行业领袖们一直在敦促供应商和客户之间建立更紧密的联系。在爱尔兰的英特尔Fab 10工厂,我们相信通过供应商支持计划,这一概念在半导体行业比以往任何时候都走得更远。英特尔的Fab 10工厂并没有遵循传统的Fab支持结构,而是用供应商人员来执行设备工程功能。整个系统在加速英特尔十亿美元奔腾晶圆厂启动方面的性能,讨论了工厂斜坡时间,程序的变化阶段以及在线良率和模具良率的后果和期望。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A shared approach to wafer fab support
For many years industry gurus have been urging closer links between suppliers and customers. At the Intel Fab 10 facility in Ireland, we believe this concept has been taken further than ever before in the semiconductor industry, via the Supplier Support Program. Intel's Fab 10 facility does not follow the traditional Fab support structure, in that it has substituted supplier personnel to carry out the equipment engineering functions. The performance of the overall system in expediting the turn on of Intel's billion dollar Pentium fab is discussed with respect to factory ramp time, the changing phases of the program and the consequences and expectations on line yield and die yield.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信