{"title":"用模糊-概率混合方法评估电力系统运行中组件故障、需求和发电成本不确定性的影响","authors":"Bruno AndreGomes, J. Saraiva","doi":"10.1109/EEM.2011.5953000","DOIUrl":null,"url":null,"abstract":"This paper reviews the concepts and the solution algorithm of the Fuzzy DC OPF problem admitting generation costs and load values modeled by fuzzy numbers and details the integration of this problem in the Monte Carlo simulation model. In this sense, the paper describes an hybrid approach in which generation cost and demand uncertainties are represented by fuzzy numbers and the life cycle of the system components is modeled by probabilistic approaches. On this topic, the paper addresses the sampling procedure, the analysis of sampled states, the convergence testing and the computation of the expected values of the system Power Not Supplied and system risk indices. Finally, the paper includes results based on the IEEE 24 bus/38 branch test system to illustrate the proposed approach.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Fuzzy — Probabilistic hybrid approach to evaluate the impact of component outages, demand and generation cost uncertainties in the operation of power systems\",\"authors\":\"Bruno AndreGomes, J. Saraiva\",\"doi\":\"10.1109/EEM.2011.5953000\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper reviews the concepts and the solution algorithm of the Fuzzy DC OPF problem admitting generation costs and load values modeled by fuzzy numbers and details the integration of this problem in the Monte Carlo simulation model. In this sense, the paper describes an hybrid approach in which generation cost and demand uncertainties are represented by fuzzy numbers and the life cycle of the system components is modeled by probabilistic approaches. On this topic, the paper addresses the sampling procedure, the analysis of sampled states, the convergence testing and the computation of the expected values of the system Power Not Supplied and system risk indices. Finally, the paper includes results based on the IEEE 24 bus/38 branch test system to illustrate the proposed approach.\",\"PeriodicalId\":143375,\"journal\":{\"name\":\"2011 8th International Conference on the European Energy Market (EEM)\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 8th International Conference on the European Energy Market (EEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2011.5953000\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5953000","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Fuzzy — Probabilistic hybrid approach to evaluate the impact of component outages, demand and generation cost uncertainties in the operation of power systems
This paper reviews the concepts and the solution algorithm of the Fuzzy DC OPF problem admitting generation costs and load values modeled by fuzzy numbers and details the integration of this problem in the Monte Carlo simulation model. In this sense, the paper describes an hybrid approach in which generation cost and demand uncertainties are represented by fuzzy numbers and the life cycle of the system components is modeled by probabilistic approaches. On this topic, the paper addresses the sampling procedure, the analysis of sampled states, the convergence testing and the computation of the expected values of the system Power Not Supplied and system risk indices. Finally, the paper includes results based on the IEEE 24 bus/38 branch test system to illustrate the proposed approach.