{"title":"P-FRP系统的时序分析","authors":"D. Underwood, A. Cheng","doi":"10.1145/2930957.2930960","DOIUrl":null,"url":null,"abstract":"P-FRP systems are relatively new, so little research has been done on how tasks are best scheduled using the P-FRP paradigm. This paper provides a background of the subjects that timing analysis must cover, and concludes with suggestions for future research to be done in this field.","PeriodicalId":447904,"journal":{"name":"SIGBED Rev.","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Timing analysis of P-FRP systems\",\"authors\":\"D. Underwood, A. Cheng\",\"doi\":\"10.1145/2930957.2930960\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"P-FRP systems are relatively new, so little research has been done on how tasks are best scheduled using the P-FRP paradigm. This paper provides a background of the subjects that timing analysis must cover, and concludes with suggestions for future research to be done in this field.\",\"PeriodicalId\":447904,\"journal\":{\"name\":\"SIGBED Rev.\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-04-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SIGBED Rev.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/2930957.2930960\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SIGBED Rev.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/2930957.2930960","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
P-FRP systems are relatively new, so little research has been done on how tasks are best scheduled using the P-FRP paradigm. This paper provides a background of the subjects that timing analysis must cover, and concludes with suggestions for future research to be done in this field.