{"title":"Rekonstrukcija transformatorske stanice 35/10kV u spoljašnje razvodno postrojenje 20kV 20211, XXIII","authors":"Srbislav Sarić, Biljana Sarić","doi":"10.46793/eee21-1.61s","DOIUrl":null,"url":null,"abstract":"In the distribution area of Novi Sad, owned by ODS EPS Distribucija, there are 35 substations 35/10kV that are on average over 50 years old. Considering the tendency to gradually eliminate the voltage levels of 35kV and 10kV in this distribution area and the transition to the voltage level of 20kV, some of these substations are planned for reconstruction into 20kV distribution plants. Reconstruction of these substations requires large financial resources, because their construction part is in a very bad condition, electric power equipment is unreliable and difficult to maintain, and operational readiness is an increasingly important factor in presenting successful business. During the reconstruction of these transformer stations, the possibility of a backup power supply route for electricity customers, the speed of intervention and the smooth performance of preventive maintenance must be taken into account. The appearance of reclosers opened a new chapter in the world of electricity. Namely, now the above problems and requirements can be solved in a simpler and cheaper way with the use of reclosers. The paper will present a proposal for the reconstruction of the substaion 35/10 kV \"Kuzmin\" in the area of the Branch Distribution Sremska Mitrovica, which has been operating for more than 60 years, in an external 20 kV distribution plant formed with the help of reclosers built on steel lattice poles. The proposed solution can be used to solve the same or similar problems, primarily in the distribution area of Novi Sad.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"257 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee21-1.61s","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在诺维萨德的配电区内,ODS EPS Distribucija拥有35个35/ 10kv变电站,平均年龄超过50年。考虑到该配电区35kV、10kV电压等级逐步淘汰,向20kV电压等级过渡的趋势,拟将部分变电站改造为20kV配电厂。这些变电站的改造需要大量的资金,因为它们的建设部分状况很差,电力设备不可靠,难以维护,运行就绪是呈现成功业务的一个越来越重要的因素。在对这些变电站进行改造时,必须考虑为用电客户提供备用供电路线的可能性、介入的速度和预防性维护的顺利进行。关闭器的出现开启了电力世界的新篇章。也就是说,现在使用重合闸可以以一种更简单、更便宜的方式解决上述问题和要求。该文件将提出一项关于在斯雷姆斯卡米特罗维察配电分公司地区重建35/10千伏“库兹明”变电站的建议,该变电站已经运行了60多年,在一个外部20千伏配电厂的帮助下,在钢格杆上建造了闭锁器。提出的解决方案可用于解决相同或类似的问题,主要是在诺维萨德的分配区域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Rekonstrukcija transformatorske stanice 35/10kV u spoljašnje razvodno postrojenje 20kV 20211, XXIII
In the distribution area of Novi Sad, owned by ODS EPS Distribucija, there are 35 substations 35/10kV that are on average over 50 years old. Considering the tendency to gradually eliminate the voltage levels of 35kV and 10kV in this distribution area and the transition to the voltage level of 20kV, some of these substations are planned for reconstruction into 20kV distribution plants. Reconstruction of these substations requires large financial resources, because their construction part is in a very bad condition, electric power equipment is unreliable and difficult to maintain, and operational readiness is an increasingly important factor in presenting successful business. During the reconstruction of these transformer stations, the possibility of a backup power supply route for electricity customers, the speed of intervention and the smooth performance of preventive maintenance must be taken into account. The appearance of reclosers opened a new chapter in the world of electricity. Namely, now the above problems and requirements can be solved in a simpler and cheaper way with the use of reclosers. The paper will present a proposal for the reconstruction of the substaion 35/10 kV "Kuzmin" in the area of the Branch Distribution Sremska Mitrovica, which has been operating for more than 60 years, in an external 20 kV distribution plant formed with the help of reclosers built on steel lattice poles. The proposed solution can be used to solve the same or similar problems, primarily in the distribution area of Novi Sad.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信