{"title":"PT. X .采用精益技术来还原牛仔裤生产过程中的浪费","authors":"Irfan Maulana Muwahid, Chaznin R. Muhammad, R. Amaranti","doi":"10.29313/bcsies.v3i2.9317","DOIUrl":null,"url":null,"abstract":"Abstract. PT. X is a garment company in the city of Bandung that produces various types of clothing. This research focuses on one of the company's products, namely jeans. The results of observations on the jeans production process found some waste (waste) consisting of excessive transportation, repeated inspection processes, lots of unused materials and goods, and waiting employees. This waste has an impact on production lead times that are getting longer. Therefore, this study aims to reduce waste (waste) that occurs in the production process of jeans. Improvements made are by utilizing the concept of Lean Manufacturing, assisted by Value Stream Mapping (VSM) tools, Seven Waste Questionnaire, Value Stream Mapping Analysis Tools (VALSAT), and cause and effect diagrams (Fishbone). The results of weighting waste using the Seven Waste questionnaire, obtained the three most influential types of waste, namely Excess Processing at 31.40%, Transportation at 22.09%, and Unnecessary Inventory at 16.28%, followed by other types of waste namely Waiting by 11.63%, Unnecessary Motion by 9.30%, Defect by 8.14%, and Overproduction by 1.16%. Proposals for improvements were made only for the three most influential reductions in types of waste (waste), namely by designing visual work standards, redesigning layouts, and implementing a 5S work culture. The result of implementing the improvement was a reduction in the total Production Lead Time in the Future State by 108.95 minutes, thereby increasing Process Cycle Efficiency (PCE) by 18.92%, from 57.26% to 76.19%.   Keywords: Waste, Lean Manufacturing, Value Stream Mapping (VSM)   Abstrak. PT. X merupakan perusahaan garmen di Kota Bandung yang memproduksi berbagai jenis pakaian. Penelitian ini berfokus pada salah satu produk perusahaan yaitu celana jeans. Hasil observasi pada proses produksi celana jeans ditemukan beberapa pemborosan (waste) yang terdiri dari transportasi berlebihan, proses pemeriksaan secara berulang, penumpukan bahan dan barang tidak terpakai, serta karyawan yang menunggu. Pemborosan (waste) tersebut berdampak pada lead time produksi yang semakin panjang. Oleh karena, penelitian ini bertujuan untuk mereduksi pemborosan (waste) yang terjadi pada proses produksi celana jeans. Upaya perbaikan yang dilakukan adalah dengan memanfaatkan konsep Lean Manufacturing, dibantu dengan tools Value Stream Mapping (VSM), Kuesioner Seven Waste, Value Stream Mapping Analysis Tools (VALSAT), serta diagram sebab akibat (Fishbone). Hasil pembobotan pemborosan (waste) menggunakan kuesioner Seven Waste, didapatkan tiga jenis pemborosan (waste) paling berpengaruh yaitu Excess Processing sebesar 31,40%, Transportation sebesar 22,09%, serta Unnecessary Inventory sebesar 16,28%, diikuti oleh jenis pemborosan lain yaitu Waiting sebesar 11,63%, Unecessary Motion sebesar 9,30%, Defect sebesar 8,14%, serta Overproduction sebesar 1,16%. Usulan perbaikan yang dibuat untuk mereduksi tiga jenis pemborosan (waste) paling berpengaruh yaitu dengan perancangan standarisasi kerja visual, perancangan ulang layout, serta penerapan budaya kerja 5S. Hasil penerapan usulan perbaikan adalah berkurangnya total Production Lead Time pada Future State sebesar 108,95 menit, sehingga meningkatkan Process Cycle Efficiency (PCE) sebesar 18,92% yaitu dari 57,26% menjadi 76,19%.   Kata Kunci: Waste, Lean Manufacturing, Value Stream Mapping (VSM)","PeriodicalId":127015,"journal":{"name":"Bandung Conference Series: Industrial Engineering Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Penerapan Lean Manufacturing untuk Mereduksi Waste pada Proses Produksi Celana Jeans di PT. X\",\"authors\":\"Irfan Maulana Muwahid, Chaznin R. Muhammad, R. Amaranti\",\"doi\":\"10.29313/bcsies.v3i2.9317\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract. PT. X is a garment company in the city of Bandung that produces various types of clothing. This research focuses on one of the company's products, namely jeans. The results of observations on the jeans production process found some waste (waste) consisting of excessive transportation, repeated inspection processes, lots of unused materials and goods, and waiting employees. This waste has an impact on production lead times that are getting longer. Therefore, this study aims to reduce waste (waste) that occurs in the production process of jeans. Improvements made are by utilizing the concept of Lean Manufacturing, assisted by Value Stream Mapping (VSM) tools, Seven Waste Questionnaire, Value Stream Mapping Analysis Tools (VALSAT), and cause and effect diagrams (Fishbone). The results of weighting waste using the Seven Waste questionnaire, obtained the three most influential types of waste, namely Excess Processing at 31.40%, Transportation at 22.09%, and Unnecessary Inventory at 16.28%, followed by other types of waste namely Waiting by 11.63%, Unnecessary Motion by 9.30%, Defect by 8.14%, and Overproduction by 1.16%. Proposals for improvements were made only for the three most influential reductions in types of waste (waste), namely by designing visual work standards, redesigning layouts, and implementing a 5S work culture. The result of implementing the improvement was a reduction in the total Production Lead Time in the Future State by 108.95 minutes, thereby increasing Process Cycle Efficiency (PCE) by 18.92%, from 57.26% to 76.19%.   Keywords: Waste, Lean Manufacturing, Value Stream Mapping (VSM)   Abstrak. PT. X merupakan perusahaan garmen di Kota Bandung yang memproduksi berbagai jenis pakaian. Penelitian ini berfokus pada salah satu produk perusahaan yaitu celana jeans. Hasil observasi pada proses produksi celana jeans ditemukan beberapa pemborosan (waste) yang terdiri dari transportasi berlebihan, proses pemeriksaan secara berulang, penumpukan bahan dan barang tidak terpakai, serta karyawan yang menunggu. Pemborosan (waste) tersebut berdampak pada lead time produksi yang semakin panjang. Oleh karena, penelitian ini bertujuan untuk mereduksi pemborosan (waste) yang terjadi pada proses produksi celana jeans. Upaya perbaikan yang dilakukan adalah dengan memanfaatkan konsep Lean Manufacturing, dibantu dengan tools Value Stream Mapping (VSM), Kuesioner Seven Waste, Value Stream Mapping Analysis Tools (VALSAT), serta diagram sebab akibat (Fishbone). Hasil pembobotan pemborosan (waste) menggunakan kuesioner Seven Waste, didapatkan tiga jenis pemborosan (waste) paling berpengaruh yaitu Excess Processing sebesar 31,40%, Transportation sebesar 22,09%, serta Unnecessary Inventory sebesar 16,28%, diikuti oleh jenis pemborosan lain yaitu Waiting sebesar 11,63%, Unecessary Motion sebesar 9,30%, Defect sebesar 8,14%, serta Overproduction sebesar 1,16%. Usulan perbaikan yang dibuat untuk mereduksi tiga jenis pemborosan (waste) paling berpengaruh yaitu dengan perancangan standarisasi kerja visual, perancangan ulang layout, serta penerapan budaya kerja 5S. Hasil penerapan usulan perbaikan adalah berkurangnya total Production Lead Time pada Future State sebesar 108,95 menit, sehingga meningkatkan Process Cycle Efficiency (PCE) sebesar 18,92% yaitu dari 57,26% menjadi 76,19%.   Kata Kunci: Waste, Lean Manufacturing, Value Stream Mapping (VSM)\",\"PeriodicalId\":127015,\"journal\":{\"name\":\"Bandung Conference Series: Industrial Engineering Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bandung Conference Series: Industrial Engineering Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29313/bcsies.v3i2.9317\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Industrial Engineering Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsies.v3i2.9317","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要PT. X是万隆市的一家服装公司,生产各种类型的服装。这项研究的重点是该公司的产品之一,即牛仔裤。对牛仔裤生产过程的观察结果发现了一些浪费,包括过度的运输,重复的检验过程,大量未使用的材料和货物,以及等待的员工。这种浪费对生产周期的影响越来越长。因此,本研究旨在减少牛仔裤生产过程中的浪费(waste)。改进是通过利用精益制造的概念,在价值流图(VSM)工具、七种浪费问卷、价值流图分析工具(VALSAT)和因果关系图(Fishbone)的帮助下进行的。利用Seven waste问卷对废弃物进行加权,得到影响最大的三类废弃物,即加工过剩(31.40%)、运输过剩(22.09%)和库存过剩(16.28%),其次是等待浪费(11.63%)、运输过剩(9.30%)、缺陷浪费(8.14%)和生产过剩(1.16%)。提出的改进建议仅针对三种最具影响力的废物(废物)减少,即设计视觉工作标准、重新设计布局和实施5S工作文化。实施改进的结果是总生产提前期减少了108.95分钟,从而将过程周期效率(PCE)提高了18.92%,从57.26%提高到76.19%。关键词:废弃物,精益制造,价值流图(VSM)PT. X merupakan perusahaan garmen di Kota万隆阳member producksi berbagai jenis巴基斯坦。Penelitian ini berfokus padsalah satu产品perushaan yititcelana牛仔裤。Hasil observasi pada处理produksi celana jeans ditemukan beberapa pemborosan(废物)yang terdiri dari transportasi berlebihan,处理peremeriksaan secara berulang, penumpukan bahan dan barang tidak terpakai, serta karyawan yang menungu。废铜烂铁(废料)简洁但berdampak帕达提前交货时间生产的产品。Oleh karena, penelitian ini bertujuan untuk mereduksi pemborosan(废物)yang terjadi pada加工产品celana牛仔裤。精益生产,精益生产工具价值流图(VSM), Kuesioner七种浪费,价值流图分析工具(VALSAT),图表sebab akibat(鱼骨)。Hasil pembobotan pemborsan(废物)menggunakan kuesioner七废,didapatkan tiga jenis pemborsan(废物)palapatkan tiga jenis pemborsan(废物)palatatkan peborsan(废物)palatatkan peborsan(废物)palatatkan peborsan(废物)palatatkan peborsan(废物)palatatkan peborsan(废物)palatatkan peborsan(废物)过量加工皮屑31,40%,运输皮屑22,09%,serta不必要库存皮屑16,28%,diikuti oleh jenis pemborsan lain yitu等待皮屑11,63%,不必要运动皮屑9,30%,缺陷皮屑8,14%,serta生产过剩皮屑1,16%。乌兰perbaikan yang dibuat untuk mereduksi tiga jenis pemborosan(废料)paling berpengaruh yitu dengan perancangan standarisasi kerja视觉,perancangan ulang布局,serta penerapan budaya kerja 5S。Hasil penerapan usulan perbaikan adalah berkurangnya total Production Lead Time pada Future State sebesar 108,95 menit, seingga meningkatkan Process Cycle Efficiency (PCE) sebesar 18,92% yitu dari 57,26% menjadi 76,19%。Kata Kunci:浪费、精益制造、价值流映射(VSM)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Penerapan Lean Manufacturing untuk Mereduksi Waste pada Proses Produksi Celana Jeans di PT. X
Abstract. PT. X is a garment company in the city of Bandung that produces various types of clothing. This research focuses on one of the company's products, namely jeans. The results of observations on the jeans production process found some waste (waste) consisting of excessive transportation, repeated inspection processes, lots of unused materials and goods, and waiting employees. This waste has an impact on production lead times that are getting longer. Therefore, this study aims to reduce waste (waste) that occurs in the production process of jeans. Improvements made are by utilizing the concept of Lean Manufacturing, assisted by Value Stream Mapping (VSM) tools, Seven Waste Questionnaire, Value Stream Mapping Analysis Tools (VALSAT), and cause and effect diagrams (Fishbone). The results of weighting waste using the Seven Waste questionnaire, obtained the three most influential types of waste, namely Excess Processing at 31.40%, Transportation at 22.09%, and Unnecessary Inventory at 16.28%, followed by other types of waste namely Waiting by 11.63%, Unnecessary Motion by 9.30%, Defect by 8.14%, and Overproduction by 1.16%. Proposals for improvements were made only for the three most influential reductions in types of waste (waste), namely by designing visual work standards, redesigning layouts, and implementing a 5S work culture. The result of implementing the improvement was a reduction in the total Production Lead Time in the Future State by 108.95 minutes, thereby increasing Process Cycle Efficiency (PCE) by 18.92%, from 57.26% to 76.19%.   Keywords: Waste, Lean Manufacturing, Value Stream Mapping (VSM)   Abstrak. PT. X merupakan perusahaan garmen di Kota Bandung yang memproduksi berbagai jenis pakaian. Penelitian ini berfokus pada salah satu produk perusahaan yaitu celana jeans. Hasil observasi pada proses produksi celana jeans ditemukan beberapa pemborosan (waste) yang terdiri dari transportasi berlebihan, proses pemeriksaan secara berulang, penumpukan bahan dan barang tidak terpakai, serta karyawan yang menunggu. Pemborosan (waste) tersebut berdampak pada lead time produksi yang semakin panjang. Oleh karena, penelitian ini bertujuan untuk mereduksi pemborosan (waste) yang terjadi pada proses produksi celana jeans. Upaya perbaikan yang dilakukan adalah dengan memanfaatkan konsep Lean Manufacturing, dibantu dengan tools Value Stream Mapping (VSM), Kuesioner Seven Waste, Value Stream Mapping Analysis Tools (VALSAT), serta diagram sebab akibat (Fishbone). Hasil pembobotan pemborosan (waste) menggunakan kuesioner Seven Waste, didapatkan tiga jenis pemborosan (waste) paling berpengaruh yaitu Excess Processing sebesar 31,40%, Transportation sebesar 22,09%, serta Unnecessary Inventory sebesar 16,28%, diikuti oleh jenis pemborosan lain yaitu Waiting sebesar 11,63%, Unecessary Motion sebesar 9,30%, Defect sebesar 8,14%, serta Overproduction sebesar 1,16%. Usulan perbaikan yang dibuat untuk mereduksi tiga jenis pemborosan (waste) paling berpengaruh yaitu dengan perancangan standarisasi kerja visual, perancangan ulang layout, serta penerapan budaya kerja 5S. Hasil penerapan usulan perbaikan adalah berkurangnya total Production Lead Time pada Future State sebesar 108,95 menit, sehingga meningkatkan Process Cycle Efficiency (PCE) sebesar 18,92% yaitu dari 57,26% menjadi 76,19%.   Kata Kunci: Waste, Lean Manufacturing, Value Stream Mapping (VSM)
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信