{"title":"面向产品的制造系统的调度","authors":"N. Costa, M. Varela, S. Carmo-Silva","doi":"10.1109/NaBIC.2014.6921877","DOIUrl":null,"url":null,"abstract":"Scheduling is one of the most important decisions in production control systems. This paper explores different approaches for scheduling two stage jobs in two configurations of product oriented manufacturing systems, namely an hybrid flow shop (HFS) and a parallel machine flow shop (PMFS). An industrial case is analyzed from the automotive components industry. The HFS problem resolution is compared with PMFS one in terms of makespan and other performance measures. The results allow concluding that the HFS performs considerably better than the PMFS.","PeriodicalId":209716,"journal":{"name":"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2014-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Scheduling in product oriented manufacturing systems\",\"authors\":\"N. Costa, M. Varela, S. Carmo-Silva\",\"doi\":\"10.1109/NaBIC.2014.6921877\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scheduling is one of the most important decisions in production control systems. This paper explores different approaches for scheduling two stage jobs in two configurations of product oriented manufacturing systems, namely an hybrid flow shop (HFS) and a parallel machine flow shop (PMFS). An industrial case is analyzed from the automotive components industry. The HFS problem resolution is compared with PMFS one in terms of makespan and other performance measures. The results allow concluding that the HFS performs considerably better than the PMFS.\",\"PeriodicalId\":209716,\"journal\":{\"name\":\"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NaBIC.2014.6921877\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NaBIC.2014.6921877","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scheduling in product oriented manufacturing systems
Scheduling is one of the most important decisions in production control systems. This paper explores different approaches for scheduling two stage jobs in two configurations of product oriented manufacturing systems, namely an hybrid flow shop (HFS) and a parallel machine flow shop (PMFS). An industrial case is analyzed from the automotive components industry. The HFS problem resolution is compared with PMFS one in terms of makespan and other performance measures. The results allow concluding that the HFS performs considerably better than the PMFS.