汽轮机发电机的顺序脱扣

E. Fennell, K. Koźmiński, M. Bajpai, S. Easterday-McPadden, W. Elmore, C. Fromen, J. Gardell, W. Hartmann, J. Hurley, P. Kerrigan, K. Khunkhun, C. Mozina, G. Nail, S. Patel, G. Pence, A. Pierce, D. Smaha, S. Usman, P. Waudby, M. Yalla
{"title":"汽轮机发电机的顺序脱扣","authors":"E. Fennell, K. Koźmiński, M. Bajpai, S. Easterday-McPadden, W. Elmore, C. Fromen, J. Gardell, W. Hartmann, J. Hurley, P. Kerrigan, K. Khunkhun, C. Mozina, G. Nail, S. Patel, G. Pence, A. Pierce, D. Smaha, S. Usman, P. Waudby, M. Yalla","doi":"10.1109/ICPS.1998.692531","DOIUrl":null,"url":null,"abstract":"The practice of tripping the generator breakers immediately following a boiler/turbine trip exposes a steam turbine generator to a potentially damaging overspeed operating condition. This paper describes the use of the sequential trip mode as a means of minimizing the exposure to possible unit damage following a boiler/turbine trip. Included is a comparison of the application of devices used by several major steam turbine generator manufacturers in accomplishing sequential tripping of the unit. This paper also discusses the differences in the devices used in implementing the tripping scheme and those applied as backup motoring protection. Additionally, the paper provides guidance in the selection of which functions should and should not be used to initiate sequential tripping.","PeriodicalId":436140,"journal":{"name":"1998 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record. Papers Presented at the 1998 Annual Meeting (Cat. No.98CH36202)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1998-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Sequential tripping of steam turbine generators\",\"authors\":\"E. Fennell, K. Koźmiński, M. Bajpai, S. Easterday-McPadden, W. Elmore, C. Fromen, J. Gardell, W. Hartmann, J. Hurley, P. Kerrigan, K. Khunkhun, C. Mozina, G. Nail, S. Patel, G. Pence, A. Pierce, D. Smaha, S. Usman, P. Waudby, M. Yalla\",\"doi\":\"10.1109/ICPS.1998.692531\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The practice of tripping the generator breakers immediately following a boiler/turbine trip exposes a steam turbine generator to a potentially damaging overspeed operating condition. This paper describes the use of the sequential trip mode as a means of minimizing the exposure to possible unit damage following a boiler/turbine trip. Included is a comparison of the application of devices used by several major steam turbine generator manufacturers in accomplishing sequential tripping of the unit. This paper also discusses the differences in the devices used in implementing the tripping scheme and those applied as backup motoring protection. Additionally, the paper provides guidance in the selection of which functions should and should not be used to initiate sequential tripping.\",\"PeriodicalId\":436140,\"journal\":{\"name\":\"1998 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record. Papers Presented at the 1998 Annual Meeting (Cat. No.98CH36202)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1998-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1998 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record. Papers Presented at the 1998 Annual Meeting (Cat. No.98CH36202)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPS.1998.692531\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1998 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record. Papers Presented at the 1998 Annual Meeting (Cat. No.98CH36202)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.1998.692531","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在锅炉/汽轮机脱扣后立即脱扣发电机断路器的做法会使汽轮机发电机处于潜在的破坏性超速运行状态。本文描述了使用顺序跳闸模式作为一种手段,以尽量减少暴露于可能的单位损坏后,锅炉/涡轮机跳闸。包括几个主要的汽轮发电机制造商在完成机组顺序跳闸时使用的设备的应用的比较。本文还讨论了跳闸装置与后备电动机保护装置的区别。此外,本文还提供了选择哪些函数应该和不应该用于启动顺序跳闸的指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sequential tripping of steam turbine generators
The practice of tripping the generator breakers immediately following a boiler/turbine trip exposes a steam turbine generator to a potentially damaging overspeed operating condition. This paper describes the use of the sequential trip mode as a means of minimizing the exposure to possible unit damage following a boiler/turbine trip. Included is a comparison of the application of devices used by several major steam turbine generator manufacturers in accomplishing sequential tripping of the unit. This paper also discusses the differences in the devices used in implementing the tripping scheme and those applied as backup motoring protection. Additionally, the paper provides guidance in the selection of which functions should and should not be used to initiate sequential tripping.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信