{"title":"土工模型在管理操作土工风险中的快速整合作用","authors":"MC Brockman, Kmr Gosche, D. D. Plooy","doi":"10.36487/ACG_REP/1905_24_BROCKMAN","DOIUrl":null,"url":null,"abstract":"AngloGold Ashanti (AGA) has developed a concept to integrate geotechnical input into long-term mine planning using a ‘block model approach’ referred to as a geotechnical model for rapid integration (GMRi). The GMRi is a simple spatial collection of rock mass data integrated with empirical evaluations, numerical modelling results and monitoring data for a specific mine plan. In this paper, the value of using the GMRi to manage geotechnical risk and identify opportunities associated with ground support design, stress-induced damage, design stope spans and total extraction is demonstrated. The GMRi concept allows for the rapid evaluation of spatially distributed geotechnical data and identifies areas of risk and opportunity, demonstrated at two recent underground studies completed at AGA’s Australian operations.","PeriodicalId":337751,"journal":{"name":"Proceedings of the First International Conference on Mining Geomechanical Risk","volume":"138 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The role of the geotechnical model for rapid integration in managing operational geotechnical risk\",\"authors\":\"MC Brockman, Kmr Gosche, D. D. Plooy\",\"doi\":\"10.36487/ACG_REP/1905_24_BROCKMAN\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"AngloGold Ashanti (AGA) has developed a concept to integrate geotechnical input into long-term mine planning using a ‘block model approach’ referred to as a geotechnical model for rapid integration (GMRi). The GMRi is a simple spatial collection of rock mass data integrated with empirical evaluations, numerical modelling results and monitoring data for a specific mine plan. In this paper, the value of using the GMRi to manage geotechnical risk and identify opportunities associated with ground support design, stress-induced damage, design stope spans and total extraction is demonstrated. The GMRi concept allows for the rapid evaluation of spatially distributed geotechnical data and identifies areas of risk and opportunity, demonstrated at two recent underground studies completed at AGA’s Australian operations.\",\"PeriodicalId\":337751,\"journal\":{\"name\":\"Proceedings of the First International Conference on Mining Geomechanical Risk\",\"volume\":\"138 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the First International Conference on Mining Geomechanical Risk\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36487/ACG_REP/1905_24_BROCKMAN\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the First International Conference on Mining Geomechanical Risk","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36487/ACG_REP/1905_24_BROCKMAN","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The role of the geotechnical model for rapid integration in managing operational geotechnical risk
AngloGold Ashanti (AGA) has developed a concept to integrate geotechnical input into long-term mine planning using a ‘block model approach’ referred to as a geotechnical model for rapid integration (GMRi). The GMRi is a simple spatial collection of rock mass data integrated with empirical evaluations, numerical modelling results and monitoring data for a specific mine plan. In this paper, the value of using the GMRi to manage geotechnical risk and identify opportunities associated with ground support design, stress-induced damage, design stope spans and total extraction is demonstrated. The GMRi concept allows for the rapid evaluation of spatially distributed geotechnical data and identifies areas of risk and opportunity, demonstrated at two recent underground studies completed at AGA’s Australian operations.