尼泊尔公路工程价格调整实践

A. Mishra
{"title":"尼泊尔公路工程价格调整实践","authors":"A. Mishra","doi":"10.24321/2456.9925.202003","DOIUrl":null,"url":null,"abstract":"The construction industry always faces problems on price fluctuation and adjustment of the price to compensate the cost fluctuation becomes necessary. There is dilemma on which formula of price adjustment to use in construction contracts. Price adjustment affects all the stakeholders i.e. Client, Consultant and Contractor. This research revealed about the trend of the cost of components of construction i.e. Labor, Material, Fuel, equipment etc. Compare the different formulas of price adjustment and understand the view of client, Consultant and Contractor regarding price adjustment. Questionnaire was distributed to the Client, Contractor and consultant’s representative who are a part of the above projects. For the questions based on Likert scale, afive point Likert scale ranging from 1 to 5 is adopted and Relative Importance Index wascalculated and for other questions the result is presented in the form of pie chart and bar chart. From our study, it can be concluded that most of the Clients, Contractors and Consultants are affected by price adjustment. PPMO formula should be used for price adjustments in construction contracts.After the initial completion date of contract has crossed and extension of time has been done, the price adjustment factor should be calculated based on the indices before and upto the initial completion date only and Price adjustment should be provided after the initial completion date of contract also. The research findings also suggest that 25% of bidders bid for the value range of 0-5% below the Engineers’ Estimate while only 13.85% of bidders in case of E-bidding bid for the same range. The researcher believes that the findings of this study are useful for reviewing the existing provision of public procurement system. This also supports the conviction that more constructive roles has to be played in public procurement of infrastructure projects by local governments in Newly Constituted Federal Structure of Nepal.","PeriodicalId":267306,"journal":{"name":"Journal of Advanced Research in Construction and Urban Architecture","volume":"68 s97","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Price Adjustment Practice of Road Projects in Nepal\",\"authors\":\"A. Mishra\",\"doi\":\"10.24321/2456.9925.202003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction industry always faces problems on price fluctuation and adjustment of the price to compensate the cost fluctuation becomes necessary. There is dilemma on which formula of price adjustment to use in construction contracts. Price adjustment affects all the stakeholders i.e. Client, Consultant and Contractor. This research revealed about the trend of the cost of components of construction i.e. Labor, Material, Fuel, equipment etc. Compare the different formulas of price adjustment and understand the view of client, Consultant and Contractor regarding price adjustment. Questionnaire was distributed to the Client, Contractor and consultant’s representative who are a part of the above projects. For the questions based on Likert scale, afive point Likert scale ranging from 1 to 5 is adopted and Relative Importance Index wascalculated and for other questions the result is presented in the form of pie chart and bar chart. From our study, it can be concluded that most of the Clients, Contractors and Consultants are affected by price adjustment. PPMO formula should be used for price adjustments in construction contracts.After the initial completion date of contract has crossed and extension of time has been done, the price adjustment factor should be calculated based on the indices before and upto the initial completion date only and Price adjustment should be provided after the initial completion date of contract also. The research findings also suggest that 25% of bidders bid for the value range of 0-5% below the Engineers’ Estimate while only 13.85% of bidders in case of E-bidding bid for the same range. The researcher believes that the findings of this study are useful for reviewing the existing provision of public procurement system. This also supports the conviction that more constructive roles has to be played in public procurement of infrastructure projects by local governments in Newly Constituted Federal Structure of Nepal.\",\"PeriodicalId\":267306,\"journal\":{\"name\":\"Journal of Advanced Research in Construction and Urban Architecture\",\"volume\":\"68 s97\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Research in Construction and Urban Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24321/2456.9925.202003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Research in Construction and Urban Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24321/2456.9925.202003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

建筑行业一直面临着价格波动的问题,通过调整价格来弥补成本波动是必要的。在工程合同中采用何种价格调整公式存在两难。价格调整影响所有利益相关者,即客户、顾问和承包商。本研究揭示了建筑构件的成本趋势,即人工、材料、燃料、设备等。比较不同的价格调整公式,了解业主、顾问和承包商对价格调整的看法。问卷已分发给参与上述项目的客户、承包商和顾问代表。基于李克特量表的问题采用1 ~ 5分李克特量表,计算相对重要性指数,其他问题以饼图和条形图的形式给出结果。从我们的研究中可以得出结论,大多数客户、承包商和顾问都受到了价格调整的影响。施工合同价格调整应采用PPMO公式。在超过合同初始完成日期并完成延期后,应仅根据合同初始完成日期之前和之前的指数计算价格调整系数,并在合同初始完成日期之后提供价格调整。研究结果还表明,25%的投标人投标的价值范围比工程师估价低0-5%,而在电子投标的情况下,只有13.85%的投标人投标相同的范围。研究者认为,本研究的结果对于检讨现行的公共采购制度提供是有益的。这也支持了一种信念,即在尼泊尔新成立的联邦结构中,地方政府必须在基础设施项目的公共采购中发挥更具建设性的作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Price Adjustment Practice of Road Projects in Nepal
The construction industry always faces problems on price fluctuation and adjustment of the price to compensate the cost fluctuation becomes necessary. There is dilemma on which formula of price adjustment to use in construction contracts. Price adjustment affects all the stakeholders i.e. Client, Consultant and Contractor. This research revealed about the trend of the cost of components of construction i.e. Labor, Material, Fuel, equipment etc. Compare the different formulas of price adjustment and understand the view of client, Consultant and Contractor regarding price adjustment. Questionnaire was distributed to the Client, Contractor and consultant’s representative who are a part of the above projects. For the questions based on Likert scale, afive point Likert scale ranging from 1 to 5 is adopted and Relative Importance Index wascalculated and for other questions the result is presented in the form of pie chart and bar chart. From our study, it can be concluded that most of the Clients, Contractors and Consultants are affected by price adjustment. PPMO formula should be used for price adjustments in construction contracts.After the initial completion date of contract has crossed and extension of time has been done, the price adjustment factor should be calculated based on the indices before and upto the initial completion date only and Price adjustment should be provided after the initial completion date of contract also. The research findings also suggest that 25% of bidders bid for the value range of 0-5% below the Engineers’ Estimate while only 13.85% of bidders in case of E-bidding bid for the same range. The researcher believes that the findings of this study are useful for reviewing the existing provision of public procurement system. This also supports the conviction that more constructive roles has to be played in public procurement of infrastructure projects by local governments in Newly Constituted Federal Structure of Nepal.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信