基于RAMS的爪哇-巴厘150kv输电海底电缆维护决策模型

H. Nugraha, Zivion O. Silalahi, N. Sinisuka
{"title":"基于RAMS的爪哇-巴厘150kv输电海底电缆维护决策模型","authors":"H. Nugraha, Zivion O. Silalahi, N. Sinisuka","doi":"10.1109/JPETS.2016.2516944","DOIUrl":null,"url":null,"abstract":"The application of reliability, availability, maintainability, and security (RAMS) analysis is currently developing in many fields of an electrical power system. The focus of this paper is to demonstrate the applicability of RAMS to analyze maintenance planning on the 150-kV submarine cables of the Java-Bali power transmission system in Indonesia. In this maintenance decision model, four alternatives of a maintenance scheme are made based on maintenance interval and cable's mechanical protection. Monte Carlo simulation will be used to obtain a RAMS value of each alternative. The decision is made based on a cost-effectiveness parameter using a life cycle cost analysis.","PeriodicalId":170601,"journal":{"name":"IEEE Power and Energy Technology Systems Journal","volume":"114 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Maintenance Decision Models for Java–Bali 150-kV Power Transmission Submarine Cable Using RAMS\",\"authors\":\"H. Nugraha, Zivion O. Silalahi, N. Sinisuka\",\"doi\":\"10.1109/JPETS.2016.2516944\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The application of reliability, availability, maintainability, and security (RAMS) analysis is currently developing in many fields of an electrical power system. The focus of this paper is to demonstrate the applicability of RAMS to analyze maintenance planning on the 150-kV submarine cables of the Java-Bali power transmission system in Indonesia. In this maintenance decision model, four alternatives of a maintenance scheme are made based on maintenance interval and cable's mechanical protection. Monte Carlo simulation will be used to obtain a RAMS value of each alternative. The decision is made based on a cost-effectiveness parameter using a life cycle cost analysis.\",\"PeriodicalId\":170601,\"journal\":{\"name\":\"IEEE Power and Energy Technology Systems Journal\",\"volume\":\"114 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-02-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Power and Energy Technology Systems Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JPETS.2016.2516944\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power and Energy Technology Systems Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JPETS.2016.2516944","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

目前,可靠性、可用性、可维护性和安全性(RAMS)分析在电力系统的许多领域得到了广泛的应用。本文的重点是论证RAMS在印度尼西亚爪哇-巴厘输电系统150千伏海底电缆维护计划分析中的适用性。在该维修决策模型中,根据维修间隔和电缆的机械保护情况,给出了四种维修方案的备选方案。蒙特卡罗模拟将用于获得每个备选方案的RAMS值。决策是基于使用生命周期成本分析的成本效益参数做出的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maintenance Decision Models for Java–Bali 150-kV Power Transmission Submarine Cable Using RAMS
The application of reliability, availability, maintainability, and security (RAMS) analysis is currently developing in many fields of an electrical power system. The focus of this paper is to demonstrate the applicability of RAMS to analyze maintenance planning on the 150-kV submarine cables of the Java-Bali power transmission system in Indonesia. In this maintenance decision model, four alternatives of a maintenance scheme are made based on maintenance interval and cable's mechanical protection. Monte Carlo simulation will be used to obtain a RAMS value of each alternative. The decision is made based on a cost-effectiveness parameter using a life cycle cost analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信