{"title":"参与工厂计划过程的角色","authors":"U. Dombrowski, A. Karl, Christoph Imdahl","doi":"10.1109/IEEM.2018.8607574","DOIUrl":null,"url":null,"abstract":"The continuous improvement of the current construction and planning processes is a relevant factor for the company’s success. New and existing factories must be economical, flexible and attractive at the same time. On the basis of constantly changing or even new requirements, continuous planning adjustments are required. An increasingly important need in factory planning, in addition to the participation of internal planning stakeholders, is the participation of external actors. More and more often, inadequate project-specific involvement of these actors leads to delays or cost increases in factory planning projects. This can be caused, for example, by increasing regulatory requirements, declining technology acceptance of the population in the direct environment and growing legal capacity to appeal to residents (\"Not-In-My-Backyard\"). Therefore, the participation of external actors in factory planning projects has not been sufficiently considered in the relevant literature. In order to enable stakeholder acceptance, appropriate project-specific integration of relevant stakeholders into the construction project is crucial. The basis for efficient participation is the choice of the right participation features. This article addresses the current state of research in the intersecting point of factory planning and participation research and shows the need for further research.","PeriodicalId":119238,"journal":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"284 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The Role of Participation in the Factory Planning Process\",\"authors\":\"U. Dombrowski, A. Karl, Christoph Imdahl\",\"doi\":\"10.1109/IEEM.2018.8607574\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The continuous improvement of the current construction and planning processes is a relevant factor for the company’s success. New and existing factories must be economical, flexible and attractive at the same time. On the basis of constantly changing or even new requirements, continuous planning adjustments are required. An increasingly important need in factory planning, in addition to the participation of internal planning stakeholders, is the participation of external actors. More and more often, inadequate project-specific involvement of these actors leads to delays or cost increases in factory planning projects. This can be caused, for example, by increasing regulatory requirements, declining technology acceptance of the population in the direct environment and growing legal capacity to appeal to residents (\\\"Not-In-My-Backyard\\\"). Therefore, the participation of external actors in factory planning projects has not been sufficiently considered in the relevant literature. In order to enable stakeholder acceptance, appropriate project-specific integration of relevant stakeholders into the construction project is crucial. The basis for efficient participation is the choice of the right participation features. This article addresses the current state of research in the intersecting point of factory planning and participation research and shows the need for further research.\",\"PeriodicalId\":119238,\"journal\":{\"name\":\"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"284 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2018.8607574\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2018.8607574","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

持续改进当前的建设和规划过程是公司成功的一个相关因素。新的和现有的工厂必须同时经济、灵活和有吸引力。在不断变化甚至新的需求的基础上,需要进行持续的规划调整。除了内部规划利益相关者的参与外,工厂规划中越来越重要的需求是外部参与者的参与。越来越多的情况是,这些参与者对具体项目的参与不足导致工厂规划项目的延误或成本增加。例如,这可能是由于监管要求的增加、直接环境中人口对技术接受程度的下降以及吸引居民的法律能力的提高(“不在我家后院”)。因此,相关文献并未充分考虑工厂规划项目中外部行为者的参与。为了使干系人接受,将相关干系人适当地集成到建设项目中是至关重要的。有效参与的基础是选择正确的参与特征。本文阐述了工厂规划与参与性研究交叉点的研究现状,并指出了进一步研究的需要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Role of Participation in the Factory Planning Process
The continuous improvement of the current construction and planning processes is a relevant factor for the company’s success. New and existing factories must be economical, flexible and attractive at the same time. On the basis of constantly changing or even new requirements, continuous planning adjustments are required. An increasingly important need in factory planning, in addition to the participation of internal planning stakeholders, is the participation of external actors. More and more often, inadequate project-specific involvement of these actors leads to delays or cost increases in factory planning projects. This can be caused, for example, by increasing regulatory requirements, declining technology acceptance of the population in the direct environment and growing legal capacity to appeal to residents ("Not-In-My-Backyard"). Therefore, the participation of external actors in factory planning projects has not been sufficiently considered in the relevant literature. In order to enable stakeholder acceptance, appropriate project-specific integration of relevant stakeholders into the construction project is crucial. The basis for efficient participation is the choice of the right participation features. This article addresses the current state of research in the intersecting point of factory planning and participation research and shows the need for further research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信