{"title":"为Bowland页岩选择非常规储层模拟,并结合英国陆上作业限制条件进行潜在采收率估算","authors":"B. Harrison, T. Oueidat, G. Falcone","doi":"10.2118/195521-ms","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":282279,"journal":{"name":"SPE Europec featured at 81st EAGE Conference and Exhibition","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Choosing an Unconventional Play Analog for the Bowland Shale and Incorporating Onshore United Kingdom Operational Constraints in Potential Recovery Estimates\",\"authors\":\"B. Harrison, T. Oueidat, G. Falcone\",\"doi\":\"10.2118/195521-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":282279,\"journal\":{\"name\":\"SPE Europec featured at 81st EAGE Conference and Exhibition\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SPE Europec featured at 81st EAGE Conference and Exhibition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/195521-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SPE Europec featured at 81st EAGE Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/195521-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Choosing an Unconventional Play Analog for the Bowland Shale and Incorporating Onshore United Kingdom Operational Constraints in Potential Recovery Estimates