{"title":"大型投资组合中诊断和处理it项目相互依赖关系的可行系统模型","authors":"Sameer Bathallath, Åsa B. Smedberg, Harald Kjellin","doi":"10.4018/IJITPM.2019010105","DOIUrl":null,"url":null,"abstract":"Adequately considering project interdependencies has shown to be a determinant of how successful IT/IS project portfolios are managed. However, this can be especially troublesome since there is no universal way to handle many project interdependencies that continue to change over time due to environmental uncertainty or unexpected decisions. This can seriously disrupt portfolio performance. In this article, the authors used the systems perspective to address the problem of managing multiple IT-project interdependencies in complex IT/IS portfolio environment. In particular, the authors propose using the cybernetic model Viable System Model to facilitate thinking and reasoning concerning the difficulty of managing IT-project interdependencies. To validate their approach and to ensure the appropriateness of it, the authors used real-world problem situations drawn from multiple case studies conducted in four leading organizations in Saudi Arabia. The findings support that the Viable System Model can be applied to assist in diagnosing and handling of IT-project interdependencies.","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"The Viable System Model for Diagnosing and Handling IT-Project Interdependencies in Large Portfolios\",\"authors\":\"Sameer Bathallath, Åsa B. Smedberg, Harald Kjellin\",\"doi\":\"10.4018/IJITPM.2019010105\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Adequately considering project interdependencies has shown to be a determinant of how successful IT/IS project portfolios are managed. However, this can be especially troublesome since there is no universal way to handle many project interdependencies that continue to change over time due to environmental uncertainty or unexpected decisions. This can seriously disrupt portfolio performance. In this article, the authors used the systems perspective to address the problem of managing multiple IT-project interdependencies in complex IT/IS portfolio environment. In particular, the authors propose using the cybernetic model Viable System Model to facilitate thinking and reasoning concerning the difficulty of managing IT-project interdependencies. To validate their approach and to ensure the appropriateness of it, the authors used real-world problem situations drawn from multiple case studies conducted in four leading organizations in Saudi Arabia. The findings support that the Viable System Model can be applied to assist in diagnosing and handling of IT-project interdependencies.\",\"PeriodicalId\":375999,\"journal\":{\"name\":\"Int. J. Inf. Technol. Proj. Manag.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Technol. Proj. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/IJITPM.2019010105\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/IJITPM.2019010105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

充分考虑项目的相互依赖性已经被证明是成功管理IT/IS项目组合的决定因素。然而,这可能特别麻烦,因为没有通用的方法来处理由于环境不确定性或意外决策而随时间不断变化的许多项目相互依赖关系。这可能会严重破坏投资组合的表现。在本文中,作者使用系统视角来处理在复杂的IT/IS投资组合环境中管理多个IT项目相互依赖关系的问题。特别是,作者建议使用控制论模型可行系统模型来促进关于管理it项目相互依赖性的困难的思考和推理。为了验证他们的方法并确保其适当性,作者使用了从沙特阿拉伯四个主要组织进行的多个案例研究中得出的现实问题情况。研究结果支持可行系统模型可用于协助诊断和处理资讯科技项目的相互依赖关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Viable System Model for Diagnosing and Handling IT-Project Interdependencies in Large Portfolios
Adequately considering project interdependencies has shown to be a determinant of how successful IT/IS project portfolios are managed. However, this can be especially troublesome since there is no universal way to handle many project interdependencies that continue to change over time due to environmental uncertainty or unexpected decisions. This can seriously disrupt portfolio performance. In this article, the authors used the systems perspective to address the problem of managing multiple IT-project interdependencies in complex IT/IS portfolio environment. In particular, the authors propose using the cybernetic model Viable System Model to facilitate thinking and reasoning concerning the difficulty of managing IT-project interdependencies. To validate their approach and to ensure the appropriateness of it, the authors used real-world problem situations drawn from multiple case studies conducted in four leading organizations in Saudi Arabia. The findings support that the Viable System Model can be applied to assist in diagnosing and handling of IT-project interdependencies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信