{"title":"大坝建设工程的安全风险管理:文献综述","authors":"D. Aulia, Lusi Marifah, Ikbal Yurrazak, H. Purba","doi":"10.31599/jies.v2i1.636","DOIUrl":null,"url":null,"abstract":"Safety risk assessment in dams is a traditional and modern approach to the engineering process of dams on safety systems so as to produce a design history that has a good overall record and integrity. With this approach for both old and new dams, this safety risk assessment aims to determine whether the risk the hazard can be tolerated or not, if it cannot be tolerated then there must be a solution for action to reduce the risk of danger so that the safety of the dam can be obtained. The existing risk assessment can be used as the basis for the construction of the dam to its maintenance, in this study discussed risk assessment safety on dams located in several countries such as in Asia, Europe and America. The methods implemented include the preparation of safety risks, risk analysis, risk evaluation and safety risk management. Based on research results The main risk factor that causes safety responsibilities is the Contractor's responsibility, namely the Non-technical project factor (40.54%), the 2nd rank is the Undecided Responsibility due to internal technical factors (35.13%), the 3rd rank is the technical project factor namely Contractor's Responsibility (10.8%), Rank 4 is external technical factor and external non-technical factor, the last risk factor is internal non-technical factor (2.7%) namely Joint Responsibility. \nKeywords : Risk safety management, risk assessment, risk analysis, risk evaluation, dam project","PeriodicalId":335059,"journal":{"name":"Journal of Industrial and Engineering System","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Safety Risk Management in Dam Construction Projects: Literature Review\",\"authors\":\"D. Aulia, Lusi Marifah, Ikbal Yurrazak, H. Purba\",\"doi\":\"10.31599/jies.v2i1.636\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Safety risk assessment in dams is a traditional and modern approach to the engineering process of dams on safety systems so as to produce a design history that has a good overall record and integrity. With this approach for both old and new dams, this safety risk assessment aims to determine whether the risk the hazard can be tolerated or not, if it cannot be tolerated then there must be a solution for action to reduce the risk of danger so that the safety of the dam can be obtained. The existing risk assessment can be used as the basis for the construction of the dam to its maintenance, in this study discussed risk assessment safety on dams located in several countries such as in Asia, Europe and America. The methods implemented include the preparation of safety risks, risk analysis, risk evaluation and safety risk management. Based on research results The main risk factor that causes safety responsibilities is the Contractor's responsibility, namely the Non-technical project factor (40.54%), the 2nd rank is the Undecided Responsibility due to internal technical factors (35.13%), the 3rd rank is the technical project factor namely Contractor's Responsibility (10.8%), Rank 4 is external technical factor and external non-technical factor, the last risk factor is internal non-technical factor (2.7%) namely Joint Responsibility. \\nKeywords : Risk safety management, risk assessment, risk analysis, risk evaluation, dam project\",\"PeriodicalId\":335059,\"journal\":{\"name\":\"Journal of Industrial and Engineering System\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Industrial and Engineering System\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31599/jies.v2i1.636\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Industrial and Engineering System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31599/jies.v2i1.636","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

大坝安全风险评估是对大坝安全系统的工程过程进行传统和现代的评估,以产生具有良好的整体记录和完整性的设计历史。对于新老大坝,这种安全风险评估的目的是确定风险是否可以容忍的危害,如果不能容忍,那么必须有一个行动的解决方案,以减少危险的风险,从而获得大坝的安全。现有的风险评估可以作为大坝建设和维护的依据,本研究讨论了位于亚洲、欧洲和美洲等几个国家的大坝的风险评估安全性。实施的方法包括安全风险准备、风险分析、风险评价和安全风险管理。研究结果表明,引起安全责任的主要风险因素是承包商的责任,即非技术项目因素(40.54%),排名第二的是由于内部技术因素导致的未确定责任(35.13%),排名第三的是技术项目因素,即承包商的责任(10.8%),排名第四的是外部技术因素和外部非技术因素。最后一个风险因素是内部非技术因素(2.7%),即共同责任。关键词:风险安全管理,风险评价,风险分析,风险评价,大坝工程
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Safety Risk Management in Dam Construction Projects: Literature Review
Safety risk assessment in dams is a traditional and modern approach to the engineering process of dams on safety systems so as to produce a design history that has a good overall record and integrity. With this approach for both old and new dams, this safety risk assessment aims to determine whether the risk the hazard can be tolerated or not, if it cannot be tolerated then there must be a solution for action to reduce the risk of danger so that the safety of the dam can be obtained. The existing risk assessment can be used as the basis for the construction of the dam to its maintenance, in this study discussed risk assessment safety on dams located in several countries such as in Asia, Europe and America. The methods implemented include the preparation of safety risks, risk analysis, risk evaluation and safety risk management. Based on research results The main risk factor that causes safety responsibilities is the Contractor's responsibility, namely the Non-technical project factor (40.54%), the 2nd rank is the Undecided Responsibility due to internal technical factors (35.13%), the 3rd rank is the technical project factor namely Contractor's Responsibility (10.8%), Rank 4 is external technical factor and external non-technical factor, the last risk factor is internal non-technical factor (2.7%) namely Joint Responsibility. Keywords : Risk safety management, risk assessment, risk analysis, risk evaluation, dam project
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信