具有后现货分配储备义务的运行水电调度

J. Kong, H. Skjelbred
{"title":"具有后现货分配储备义务的运行水电调度","authors":"J. Kong, H. Skjelbred","doi":"10.1109/EEM.2017.7981874","DOIUrl":null,"url":null,"abstract":"As a reliable and flexible electric power source, hydropower can quickly adjust its generation level and provide reserve power to balance the power fluctuations in the system. In this paper, we assume that the day-ahead spot market is cleared and the obligation for each reserve type is already contracted in a preceding market. Then the question is how to make the optimal decision to determine, for each unit and for each time step, the dispatched volume for the day-ahead market and the reserved capacity for various types of reserve. We formulate the constraints added to the optimization problem for distributing reserve obligations. The proposed mathematical formulation is based on an operational hydropower scheduling model used by most large hydro-power producers in Scandinavia.","PeriodicalId":416082,"journal":{"name":"2017 14th International Conference on the European Energy Market (EEM)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Operational hydropower scheduling with post-spot distribution of reserve obligations\",\"authors\":\"J. Kong, H. Skjelbred\",\"doi\":\"10.1109/EEM.2017.7981874\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As a reliable and flexible electric power source, hydropower can quickly adjust its generation level and provide reserve power to balance the power fluctuations in the system. In this paper, we assume that the day-ahead spot market is cleared and the obligation for each reserve type is already contracted in a preceding market. Then the question is how to make the optimal decision to determine, for each unit and for each time step, the dispatched volume for the day-ahead market and the reserved capacity for various types of reserve. We formulate the constraints added to the optimization problem for distributing reserve obligations. The proposed mathematical formulation is based on an operational hydropower scheduling model used by most large hydro-power producers in Scandinavia.\",\"PeriodicalId\":416082,\"journal\":{\"name\":\"2017 14th International Conference on the European Energy Market (EEM)\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 14th International Conference on the European Energy Market (EEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2017.7981874\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 14th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2017.7981874","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

水电作为一种可靠、灵活的电力来源,可以快速调整发电水平,提供备用电力,平衡系统的功率波动。在本文中,我们假设日前现货市场是出清的,并且每种储备类型的义务已经在之前的市场中签订了合同。接下来的问题是如何做出最优决策,以确定每个单位和每个时间步长的日前市场的分配量和各种储备的预留容量。我们提出了分配储备义务的优化问题的约束条件。所提出的数学公式是基于斯堪的纳维亚半岛大多数大型水力发电商使用的运行水力发电调度模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Operational hydropower scheduling with post-spot distribution of reserve obligations
As a reliable and flexible electric power source, hydropower can quickly adjust its generation level and provide reserve power to balance the power fluctuations in the system. In this paper, we assume that the day-ahead spot market is cleared and the obligation for each reserve type is already contracted in a preceding market. Then the question is how to make the optimal decision to determine, for each unit and for each time step, the dispatched volume for the day-ahead market and the reserved capacity for various types of reserve. We formulate the constraints added to the optimization problem for distributing reserve obligations. The proposed mathematical formulation is based on an operational hydropower scheduling model used by most large hydro-power producers in Scandinavia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信