{"title":"IEC 61850互操作性测试的重要性","authors":"J.C. Tan, C. Zhang, Z. Bo","doi":"10.1109/UPEC.2008.4651594","DOIUrl":null,"url":null,"abstract":"This paper discusses the factors affecting interoperability between multi-vendor devices, the necessity for interoperability testing, and the types of interoperability should be conducted. It is recommended that proof-of-concept interoperability should be preformed before full scope integration, and it is crucial to adopt interoperability testing as part of site commissioning test. Interoperability testing is the next step forward after conformance test to ensure an IEC 61850 based substation automation system will interoperate as it is designed in the field. Conformance test can reduce the number of costly issues and problems during integration, site commissioning and operation. Devices passed conformance test may still subject to issues during integration, commissioning and operation. Conformance test does not mean interoperability test. Conformance testing cannot replace interoperability testing.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":"{\"title\":\"The importance of IEC 61850 interoperability testing\",\"authors\":\"J.C. Tan, C. Zhang, Z. Bo\",\"doi\":\"10.1109/UPEC.2008.4651594\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses the factors affecting interoperability between multi-vendor devices, the necessity for interoperability testing, and the types of interoperability should be conducted. It is recommended that proof-of-concept interoperability should be preformed before full scope integration, and it is crucial to adopt interoperability testing as part of site commissioning test. Interoperability testing is the next step forward after conformance test to ensure an IEC 61850 based substation automation system will interoperate as it is designed in the field. Conformance test can reduce the number of costly issues and problems during integration, site commissioning and operation. Devices passed conformance test may still subject to issues during integration, commissioning and operation. Conformance test does not mean interoperability test. Conformance testing cannot replace interoperability testing.\",\"PeriodicalId\":287461,\"journal\":{\"name\":\"2008 43rd International Universities Power Engineering Conference\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 43rd International Universities Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC.2008.4651594\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651594","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

摘要

本文讨论了影响多厂商设备互操作性的因素、互操作性测试的必要性以及应进行的互操作性类型。建议在全面集成之前进行概念验证互操作性,并且将互操作性测试作为现场调试测试的一部分是至关重要的。互操作性测试是一致性测试之后的下一步,以确保基于IEC 61850的变电站自动化系统在现场设计时能够互操作。一致性测试可以减少在集成、现场调试和操作期间出现的昂贵问题和问题的数量。通过一致性测试的设备在集成、调试和运行过程中可能仍然存在问题。一致性测试并不意味着互操作性测试。一致性测试不能取代互操作性测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The importance of IEC 61850 interoperability testing
This paper discusses the factors affecting interoperability between multi-vendor devices, the necessity for interoperability testing, and the types of interoperability should be conducted. It is recommended that proof-of-concept interoperability should be preformed before full scope integration, and it is crucial to adopt interoperability testing as part of site commissioning test. Interoperability testing is the next step forward after conformance test to ensure an IEC 61850 based substation automation system will interoperate as it is designed in the field. Conformance test can reduce the number of costly issues and problems during integration, site commissioning and operation. Devices passed conformance test may still subject to issues during integration, commissioning and operation. Conformance test does not mean interoperability test. Conformance testing cannot replace interoperability testing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信