预测变电站的电流,以便安排热成像

Per Westerlund, P. Hilber, T. Lindquist
{"title":"预测变电站的电流,以便安排热成像","authors":"Per Westerlund, P. Hilber, T. Lindquist","doi":"10.1109/PMAPS.2016.7764223","DOIUrl":null,"url":null,"abstract":"It is important to predict the current in a line in the electrical grid for example when planning thermography or handling dynamic rating. This paper takes data from a Swedish substation from 10 years and applies analysis of variance (ANOVA) to construct a linear model. The factors are the time of the day, the day of the week and the week number. About two thirds of the variance in the data can be explained by the model, but the means are too low to attain a current of at least one third of the current for which the equipment is rated. Thus the model is not good enough to plan thermography for the studied bay in the substation. However the model is able to predict the current and can also be used to predict power flows in the electric network.","PeriodicalId":265474,"journal":{"name":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Prediction of current in a substation in order to schedule thermography\",\"authors\":\"Per Westerlund, P. Hilber, T. Lindquist\",\"doi\":\"10.1109/PMAPS.2016.7764223\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is important to predict the current in a line in the electrical grid for example when planning thermography or handling dynamic rating. This paper takes data from a Swedish substation from 10 years and applies analysis of variance (ANOVA) to construct a linear model. The factors are the time of the day, the day of the week and the week number. About two thirds of the variance in the data can be explained by the model, but the means are too low to attain a current of at least one third of the current for which the equipment is rated. Thus the model is not good enough to plan thermography for the studied bay in the substation. However the model is able to predict the current and can also be used to predict power flows in the electric network.\",\"PeriodicalId\":265474,\"journal\":{\"name\":\"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PMAPS.2016.7764223\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS.2016.7764223","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在规划热成像或处理动态额定值时,预测电网线路中的电流是很重要的。本文选取瑞典某变电站10年的数据,运用方差分析(ANOVA)建立线性模型。因子是一天中的时间,一周中的哪一天和周数。数据中大约三分之二的差异可以用模型来解释,但方法太低,无法达到设备额定电流的至少三分之一。因此,该模型不能很好地为所研究的变电所进行热成像规划。然而,该模型能够预测电流,也可用于预测电网中的潮流。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Prediction of current in a substation in order to schedule thermography
It is important to predict the current in a line in the electrical grid for example when planning thermography or handling dynamic rating. This paper takes data from a Swedish substation from 10 years and applies analysis of variance (ANOVA) to construct a linear model. The factors are the time of the day, the day of the week and the week number. About two thirds of the variance in the data can be explained by the model, but the means are too low to attain a current of at least one third of the current for which the equipment is rated. Thus the model is not good enough to plan thermography for the studied bay in the substation. However the model is able to predict the current and can also be used to predict power flows in the electric network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信