{"title":"esso - 82m VLT反射镜的表面处理和测试","authors":"J. Espiard","doi":"10.1364/oft.1992.tha7","DOIUrl":null,"url":null,"abstract":"REOSC has been awarded by ESO with a contract on July 25, 1989 for the polishing of the four VLT mirrors and the following tasks: - design and manufacture of the mirror handling tool and container, - transportation of each VLT mirror blank from SCHOTT's plant in Mainz (Germany) to REOSC's plant, - design, manufacture and assembly on the mirror of special devices for the mirror fixation in the cell, - grinding, polishing and testing of the four VLT mirrors.","PeriodicalId":142307,"journal":{"name":"Optical Fabrication and Testing Workshop","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Surfacing and Testing of the E.S.O. 8.2m VLT Mirrors\",\"authors\":\"J. Espiard\",\"doi\":\"10.1364/oft.1992.tha7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"REOSC has been awarded by ESO with a contract on July 25, 1989 for the polishing of the four VLT mirrors and the following tasks: - design and manufacture of the mirror handling tool and container, - transportation of each VLT mirror blank from SCHOTT's plant in Mainz (Germany) to REOSC's plant, - design, manufacture and assembly on the mirror of special devices for the mirror fixation in the cell, - grinding, polishing and testing of the four VLT mirrors.\",\"PeriodicalId\":142307,\"journal\":{\"name\":\"Optical Fabrication and Testing Workshop\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Optical Fabrication and Testing Workshop\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1364/oft.1992.tha7\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Optical Fabrication and Testing Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1364/oft.1992.tha7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Surfacing and Testing of the E.S.O. 8.2m VLT Mirrors
REOSC has been awarded by ESO with a contract on July 25, 1989 for the polishing of the four VLT mirrors and the following tasks: - design and manufacture of the mirror handling tool and container, - transportation of each VLT mirror blank from SCHOTT's plant in Mainz (Germany) to REOSC's plant, - design, manufacture and assembly on the mirror of special devices for the mirror fixation in the cell, - grinding, polishing and testing of the four VLT mirrors.