{"title":"集成智能混合不间断电源","authors":"Humdan Islam, Md. Mujahidul Islam, Md Rezaul Hasan Rony","doi":"10.1109/ICAEE.2015.7506783","DOIUrl":null,"url":null,"abstract":"In our country meeting the demand of electricity is a very big concern. The crisis of the electricity is mainly due to increasing of load, lack of proper maintenance and other factors. To worsen this situation further, our resources are limited as well. Moreover our electricity penetration in rural areas has not improved yet. The fact that only 10% of the rural households have electricity connection and there are some parts of Bangladesh which will not get the access of electricity connection from the national grid within next 30 years [1] does not help the cause either. To overcome this crisis many projects and research has been done particularly focusing on renewable energy resources. The project in this paper illustrates the effective ways of utilizing solar and hydro energy to provide uninterruptible power supply (UPS) scheme during load shedding period also it could be used as standalone system with a minor adjustment to generate electricity. The whole project is a miniature version which could be implemented on large scale.","PeriodicalId":123939,"journal":{"name":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integration of smart hybrid uninterruptible power supply\",\"authors\":\"Humdan Islam, Md. Mujahidul Islam, Md Rezaul Hasan Rony\",\"doi\":\"10.1109/ICAEE.2015.7506783\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In our country meeting the demand of electricity is a very big concern. The crisis of the electricity is mainly due to increasing of load, lack of proper maintenance and other factors. To worsen this situation further, our resources are limited as well. Moreover our electricity penetration in rural areas has not improved yet. The fact that only 10% of the rural households have electricity connection and there are some parts of Bangladesh which will not get the access of electricity connection from the national grid within next 30 years [1] does not help the cause either. To overcome this crisis many projects and research has been done particularly focusing on renewable energy resources. The project in this paper illustrates the effective ways of utilizing solar and hydro energy to provide uninterruptible power supply (UPS) scheme during load shedding period also it could be used as standalone system with a minor adjustment to generate electricity. The whole project is a miniature version which could be implemented on large scale.\",\"PeriodicalId\":123939,\"journal\":{\"name\":\"2015 International Conference on Advances in Electrical Engineering (ICAEE)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Advances in Electrical Engineering (ICAEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICAEE.2015.7506783\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAEE.2015.7506783","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在我国,满足电力需求是一个非常大的问题。电力危机主要是由于负荷增加、缺乏适当的维护等因素造成的。更糟糕的是,我们的资源也很有限。此外,我们农村地区的电力普及率还没有提高。事实上,只有10%的农村家庭有电力连接,孟加拉国的一些地区在未来30年内将无法获得国家电网的电力连接[1],这也无助于这一事业。为了克服这一危机,许多项目和研究都特别关注可再生能源。本工程阐述了利用太阳能和水能在减载期间提供不间断电源(UPS)方案的有效方法,也可以作为独立系统进行小调整发电。整个项目是一个可以大规模实施的微型版本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration of smart hybrid uninterruptible power supply
In our country meeting the demand of electricity is a very big concern. The crisis of the electricity is mainly due to increasing of load, lack of proper maintenance and other factors. To worsen this situation further, our resources are limited as well. Moreover our electricity penetration in rural areas has not improved yet. The fact that only 10% of the rural households have electricity connection and there are some parts of Bangladesh which will not get the access of electricity connection from the national grid within next 30 years [1] does not help the cause either. To overcome this crisis many projects and research has been done particularly focusing on renewable energy resources. The project in this paper illustrates the effective ways of utilizing solar and hydro energy to provide uninterruptible power supply (UPS) scheme during load shedding period also it could be used as standalone system with a minor adjustment to generate electricity. The whole project is a miniature version which could be implemented on large scale.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信