{"title":"考虑突发事件的风力发电综合电力系统输电扩容规划","authors":"F. Ugranli, E. Karatepe","doi":"10.1109/INISTA.2014.6873643","DOIUrl":null,"url":null,"abstract":"Increasing penetration level of wind turbines in power systems reveal new challenges for the power system planners. Transmission expansion planning is one of the most important planning problems to maintain secure and reliable operation of power systems. In this study, a new transmission expansion planning methodology considering N-1 contingency conditions is proposed to find the location of new transmission lines while minimizing investment cost and curtailed wind energy. To deal with the uncertainty of load and output power of wind turbines, fuzzy clustering based probabilistic method is used for determination of load and wind scenarios. Proposed methodology uses the DC-power flow equations based optimal power flow and integer genetic algorithm to determine the locations of new assets and it is applied to the modified IEEE 24-bus test system.","PeriodicalId":339652,"journal":{"name":"2014 IEEE International Symposium on Innovations in Intelligent Systems and Applications (INISTA) Proceedings","volume":"72 10","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Transmission expansion planning for wind turbine integrated power systems considering contingencies\",\"authors\":\"F. Ugranli, E. Karatepe\",\"doi\":\"10.1109/INISTA.2014.6873643\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Increasing penetration level of wind turbines in power systems reveal new challenges for the power system planners. Transmission expansion planning is one of the most important planning problems to maintain secure and reliable operation of power systems. In this study, a new transmission expansion planning methodology considering N-1 contingency conditions is proposed to find the location of new transmission lines while minimizing investment cost and curtailed wind energy. To deal with the uncertainty of load and output power of wind turbines, fuzzy clustering based probabilistic method is used for determination of load and wind scenarios. Proposed methodology uses the DC-power flow equations based optimal power flow and integer genetic algorithm to determine the locations of new assets and it is applied to the modified IEEE 24-bus test system.\",\"PeriodicalId\":339652,\"journal\":{\"name\":\"2014 IEEE International Symposium on Innovations in Intelligent Systems and Applications (INISTA) Proceedings\",\"volume\":\"72 10\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE International Symposium on Innovations in Intelligent Systems and Applications (INISTA) Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INISTA.2014.6873643\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Symposium on Innovations in Intelligent Systems and Applications (INISTA) Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INISTA.2014.6873643","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

风力发电机组在电力系统中的渗透水平不断提高,给电力系统规划者提出了新的挑战。输电扩容规划是保障电力系统安全可靠运行的重要规划问题之一。在本研究中,提出了一种考虑N-1应急条件的输电扩展规划新方法,以寻找新的输电线路的位置,同时最小化投资成本和减少风能。针对风力发电机组负荷和输出功率的不确定性,采用基于模糊聚类的概率方法确定负荷和风力情景。该方法采用基于直流潮流方程的最优潮流和整数遗传算法确定新资产的位置,并将其应用于改进的IEEE 24总线测试系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transmission expansion planning for wind turbine integrated power systems considering contingencies
Increasing penetration level of wind turbines in power systems reveal new challenges for the power system planners. Transmission expansion planning is one of the most important planning problems to maintain secure and reliable operation of power systems. In this study, a new transmission expansion planning methodology considering N-1 contingency conditions is proposed to find the location of new transmission lines while minimizing investment cost and curtailed wind energy. To deal with the uncertainty of load and output power of wind turbines, fuzzy clustering based probabilistic method is used for determination of load and wind scenarios. Proposed methodology uses the DC-power flow equations based optimal power flow and integer genetic algorithm to determine the locations of new assets and it is applied to the modified IEEE 24-bus test system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信