结构解构建模(ISM)的应用程序是泗水拖延建筑项目的原因

Eric Cahyadi Halim, Andi Andi, J. Rahardjo
{"title":"结构解构建模(ISM)的应用程序是泗水拖延建筑项目的原因","authors":"Eric Cahyadi Halim, Andi Andi, J. Rahardjo","doi":"10.9744/DUTS.8.1.60-77","DOIUrl":null,"url":null,"abstract":" Construction projects run the risk of not conforming to the initial expectations of development. It is very difficult to estimate the time of a project because a project is not repetitive, there are different challenges in each development project. Delay in completing a project will cause waste in the form of overtime and overbudget. This research was conducted using judgment sampling to 5 respondents who were expert contractors. The objectives to be achieved through this research are to identify the dominant factors causing delays in a residental project using the Decision Making Trial and Evaluation Laboratory (DEMATEL) method and modeling the relationship between the factors that cause delays in residential construction projects using the Interpretive Structural Modeling (ISM) method. The result of this research is the existence of 8 levels of sub-factor hierarchical structure which becomes the framework for contractors and project owners to reduce the risk of delays in residential construction projects. The dominant causes of delays in project development are design changes during construction, late delivery of materials, late approval of work drawings, late payments, and inappropriate work methods.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"APLIKASI INTERPRETIVE STRUCTURAL MODELING (ISM) PADA FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA\",\"authors\":\"Eric Cahyadi Halim, Andi Andi, J. Rahardjo\",\"doi\":\"10.9744/DUTS.8.1.60-77\",\"DOIUrl\":null,\"url\":null,\"abstract\":\" Construction projects run the risk of not conforming to the initial expectations of development. It is very difficult to estimate the time of a project because a project is not repetitive, there are different challenges in each development project. Delay in completing a project will cause waste in the form of overtime and overbudget. This research was conducted using judgment sampling to 5 respondents who were expert contractors. The objectives to be achieved through this research are to identify the dominant factors causing delays in a residental project using the Decision Making Trial and Evaluation Laboratory (DEMATEL) method and modeling the relationship between the factors that cause delays in residential construction projects using the Interpretive Structural Modeling (ISM) method. The result of this research is the existence of 8 levels of sub-factor hierarchical structure which becomes the framework for contractors and project owners to reduce the risk of delays in residential construction projects. The dominant causes of delays in project development are design changes during construction, late delivery of materials, late approval of work drawings, late payments, and inappropriate work methods.\",\"PeriodicalId\":187066,\"journal\":{\"name\":\"Dimensi Utama Teknik Sipil\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dimensi Utama Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.9744/DUTS.8.1.60-77\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dimensi Utama Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/DUTS.8.1.60-77","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

建设项目有不符合最初开发预期的风险。估计一个项目的时间是非常困难的,因为一个项目不是重复的,每个开发项目都有不同的挑战。延迟完成一个项目会造成超时和超支的浪费。本研究采用判断抽样法对5名专业承包商进行调查。本研究的目的是通过决策试验和评估实验室(DEMATEL)方法确定导致住宅项目延迟的主要因素,并使用解释结构建模(ISM)方法对导致住宅建设项目延迟的因素之间的关系进行建模。本研究的结果是存在8个层次的子因素层次结构,这成为承包商和项目业主降低住宅建设项目延迟风险的框架。项目开发延迟的主要原因是施工期间的设计变更、材料的延迟交付、工作图纸的延迟批准、延迟付款和不适当的工作方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
APLIKASI INTERPRETIVE STRUCTURAL MODELING (ISM) PADA FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA
 Construction projects run the risk of not conforming to the initial expectations of development. It is very difficult to estimate the time of a project because a project is not repetitive, there are different challenges in each development project. Delay in completing a project will cause waste in the form of overtime and overbudget. This research was conducted using judgment sampling to 5 respondents who were expert contractors. The objectives to be achieved through this research are to identify the dominant factors causing delays in a residental project using the Decision Making Trial and Evaluation Laboratory (DEMATEL) method and modeling the relationship between the factors that cause delays in residential construction projects using the Interpretive Structural Modeling (ISM) method. The result of this research is the existence of 8 levels of sub-factor hierarchical structure which becomes the framework for contractors and project owners to reduce the risk of delays in residential construction projects. The dominant causes of delays in project development are design changes during construction, late delivery of materials, late approval of work drawings, late payments, and inappropriate work methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信