葡萄牙工业电能质量成本估算

Carlos Patrão, J. Delgado, A. D. de Almeida, Paula Fonseca
{"title":"葡萄牙工业电能质量成本估算","authors":"Carlos Patrão, J. Delgado, A. D. de Almeida, Paula Fonseca","doi":"10.1109/EPQU.2011.6128961","DOIUrl":null,"url":null,"abstract":"This paper presents the main results of a survey conducted in Portugal to evaluate the costs associated with Power Quality disturbances in Industry (more specifically of four typical and most common voltage interruptions). The survey was conducted in different companies from different industrial sectors. Although Power Quality Costs estimation was the main issue of the survey, several other issues were analyzed in order to evaluate important matters such as customer satisfaction. From the analysis of the collected data, the vast majority of companies are satisfied with the Quality of Service provided by the utility, but they indicated the \"utility\" and \"weather conditions\" as the main responsible for power supply disturbances. It is clear that the Power Quality disturbances cause high costs to the companies in all the sectors analyzed. This study allowed to get a good picture and to quantify the Portuguese Power Quality Costs related with electrical power supply disturbances.","PeriodicalId":369941,"journal":{"name":"11th International Conference on Electrical Power Quality and Utilisation","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Power Quality Costs estimation in Portuguese industry\",\"authors\":\"Carlos Patrão, J. Delgado, A. D. de Almeida, Paula Fonseca\",\"doi\":\"10.1109/EPQU.2011.6128961\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the main results of a survey conducted in Portugal to evaluate the costs associated with Power Quality disturbances in Industry (more specifically of four typical and most common voltage interruptions). The survey was conducted in different companies from different industrial sectors. Although Power Quality Costs estimation was the main issue of the survey, several other issues were analyzed in order to evaluate important matters such as customer satisfaction. From the analysis of the collected data, the vast majority of companies are satisfied with the Quality of Service provided by the utility, but they indicated the \\\"utility\\\" and \\\"weather conditions\\\" as the main responsible for power supply disturbances. It is clear that the Power Quality disturbances cause high costs to the companies in all the sectors analyzed. This study allowed to get a good picture and to quantify the Portuguese Power Quality Costs related with electrical power supply disturbances.\",\"PeriodicalId\":369941,\"journal\":{\"name\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPQU.2011.6128961\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on Electrical Power Quality and Utilisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPQU.2011.6128961","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

本文介绍了在葡萄牙进行的一项调查的主要结果,该调查旨在评估与工业电力质量干扰(更具体地说,是四种典型和最常见的电压中断)相关的成本。这项调查是在不同行业的不同公司进行的。虽然电能质量成本估计是调查的主要问题,但为了评估客户满意度等重要事项,还分析了其他几个问题。从收集到的数据分析来看,绝大多数公司对公用事业公司提供的服务质量表示满意,但他们指出“公用事业”和“天气条件”是造成供电干扰的主要原因。很明显,电能质量干扰给所有被分析行业的公司带来了高昂的成本。这项研究可以得到一个很好的画面,并量化葡萄牙电力质量成本与电力供应干扰。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Power Quality Costs estimation in Portuguese industry
This paper presents the main results of a survey conducted in Portugal to evaluate the costs associated with Power Quality disturbances in Industry (more specifically of four typical and most common voltage interruptions). The survey was conducted in different companies from different industrial sectors. Although Power Quality Costs estimation was the main issue of the survey, several other issues were analyzed in order to evaluate important matters such as customer satisfaction. From the analysis of the collected data, the vast majority of companies are satisfied with the Quality of Service provided by the utility, but they indicated the "utility" and "weather conditions" as the main responsible for power supply disturbances. It is clear that the Power Quality disturbances cause high costs to the companies in all the sectors analyzed. This study allowed to get a good picture and to quantify the Portuguese Power Quality Costs related with electrical power supply disturbances.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信