Christian Maleck, Gottfried Nieke, K. Bock, Detlef Pabst, M. Schulze, M. Stehli
{"title":"具有时间约束的半导体制造生产区域鲁棒多阶段调度方法","authors":"Christian Maleck, Gottfried Nieke, K. Bock, Detlef Pabst, M. Schulze, M. Stehli","doi":"10.1109/ASMC.2019.8791779","DOIUrl":null,"url":null,"abstract":"In this paper we will present a multi-stage scheduling approach to generate robust schedules for a challenging aspect of semiconductor manufacturing called time-link areas. A time-link is a technologically induced time constraint between one or more consecutive process steps requiring the process steps to be executed within a predefined time window. Time-links are often introduced to control contamination or unwanted oxidation. Violating time-link constraints may lead to extra effort due to additional rework steps and may have negative yield impact or may even, result in scrap.","PeriodicalId":287541,"journal":{"name":"2019 30th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Robust Multi-Stage Scheduling Approach for Semiconductor Manufacturing Production Areas with Time Contraints\",\"authors\":\"Christian Maleck, Gottfried Nieke, K. Bock, Detlef Pabst, M. Schulze, M. Stehli\",\"doi\":\"10.1109/ASMC.2019.8791779\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper we will present a multi-stage scheduling approach to generate robust schedules for a challenging aspect of semiconductor manufacturing called time-link areas. A time-link is a technologically induced time constraint between one or more consecutive process steps requiring the process steps to be executed within a predefined time window. Time-links are often introduced to control contamination or unwanted oxidation. Violating time-link constraints may lead to extra effort due to additional rework steps and may have negative yield impact or may even, result in scrap.\",\"PeriodicalId\":287541,\"journal\":{\"name\":\"2019 30th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 30th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.2019.8791779\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 30th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2019.8791779","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Robust Multi-Stage Scheduling Approach for Semiconductor Manufacturing Production Areas with Time Contraints
In this paper we will present a multi-stage scheduling approach to generate robust schedules for a challenging aspect of semiconductor manufacturing called time-link areas. A time-link is a technologically induced time constraint between one or more consecutive process steps requiring the process steps to be executed within a predefined time window. Time-links are often introduced to control contamination or unwanted oxidation. Violating time-link constraints may lead to extra effort due to additional rework steps and may have negative yield impact or may even, result in scrap.