钢退火过程作为混合系统的最优控制

Y. C. Cho, W. Kwon, C. Cassandras
{"title":"钢退火过程作为混合系统的最优控制","authors":"Y. C. Cho, W. Kwon, C. Cassandras","doi":"10.1109/CDC.2000.912820","DOIUrl":null,"url":null,"abstract":"This paper formulates and solves an optimal control problem for steel annealing manufacturing processes involving one or more furnaces integrated with plant-wide planning and scheduling operations. We use a hybrid system framework to capture the tradeoff between metallurgical quality requirements and timely product delivery. The resulting nonconvex and nondifferentiable problem is solved by decomposing it into several smaller and simpler constrained convex optimization subproblems. Although the number of such subproblems appears to be combinationally large in the number N of jobs to be completed, we use a recently developed approach for identifying at most 2N-1 such problems and provide some explicit numerical results.","PeriodicalId":217237,"journal":{"name":"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"24","resultStr":"{\"title\":\"Optimal control for steel annealing processes as hybrid systems\",\"authors\":\"Y. C. Cho, W. Kwon, C. Cassandras\",\"doi\":\"10.1109/CDC.2000.912820\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper formulates and solves an optimal control problem for steel annealing manufacturing processes involving one or more furnaces integrated with plant-wide planning and scheduling operations. We use a hybrid system framework to capture the tradeoff between metallurgical quality requirements and timely product delivery. The resulting nonconvex and nondifferentiable problem is solved by decomposing it into several smaller and simpler constrained convex optimization subproblems. Although the number of such subproblems appears to be combinationally large in the number N of jobs to be completed, we use a recently developed approach for identifying at most 2N-1 such problems and provide some explicit numerical results.\",\"PeriodicalId\":217237,\"journal\":{\"name\":\"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"24\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CDC.2000.912820\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.2000.912820","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 24

摘要

本文提出并解决了一个包含一台或多台炉的钢铁退火制造过程的最优控制问题,该问题与全厂计划调度操作相结合。我们使用混合系统框架来获取冶金质量要求和及时产品交付之间的权衡。将得到的非凸不可微问题分解为若干更小、更简单的约束凸优化子问题来求解。尽管在要完成的N个作业中,这样的子问题的数量组合起来似乎很大,但我们使用最近开发的方法来识别最多2N-1个这样的问题,并提供一些明确的数值结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal control for steel annealing processes as hybrid systems
This paper formulates and solves an optimal control problem for steel annealing manufacturing processes involving one or more furnaces integrated with plant-wide planning and scheduling operations. We use a hybrid system framework to capture the tradeoff between metallurgical quality requirements and timely product delivery. The resulting nonconvex and nondifferentiable problem is solved by decomposing it into several smaller and simpler constrained convex optimization subproblems. Although the number of such subproblems appears to be combinationally large in the number N of jobs to be completed, we use a recently developed approach for identifying at most 2N-1 such problems and provide some explicit numerical results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信