在新技术中使用旧技术——在BPM项目中定义业务集成范围的新方法

Morteza Alaeddini, A. Kardan
{"title":"在新技术中使用旧技术——在BPM项目中定义业务集成范围的新方法","authors":"Morteza Alaeddini, A. Kardan","doi":"10.1109/ICCIT.2009.5407290","DOIUrl":null,"url":null,"abstract":"Nowadays, using business process management (BPM) systems is so prevalent through the world, so that deploying information systems (IS) based on this technology has become one of the application development methods in the new age of software engineering. Due to acquisition and using this technology in many organizations without awareness or program, that is the main reason which would fail this type of projects, we are looking for an efficient method in order to grain information systems, based on organization's business processes for the sake of defining the scope of their related software development projects, in the shortest time and with the lowest cost. We have started our scientific researches on this field in a few projects with the nature of information technology (IT) planning and gained noteworthy results that one of them is described in this paper as a case study. This new method will be used as the first step in defining project portfolios according to BPM approach, and in some actions like enterprise architecture (EA) or IT/IS planning.","PeriodicalId":443258,"journal":{"name":"2009 12th International Conference on Computers and Information Technology","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Using an old technique in a new technology — A novel method for defining the scope of ISs in BPM projects\",\"authors\":\"Morteza Alaeddini, A. Kardan\",\"doi\":\"10.1109/ICCIT.2009.5407290\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays, using business process management (BPM) systems is so prevalent through the world, so that deploying information systems (IS) based on this technology has become one of the application development methods in the new age of software engineering. Due to acquisition and using this technology in many organizations without awareness or program, that is the main reason which would fail this type of projects, we are looking for an efficient method in order to grain information systems, based on organization's business processes for the sake of defining the scope of their related software development projects, in the shortest time and with the lowest cost. We have started our scientific researches on this field in a few projects with the nature of information technology (IT) planning and gained noteworthy results that one of them is described in this paper as a case study. This new method will be used as the first step in defining project portfolios according to BPM approach, and in some actions like enterprise architecture (EA) or IT/IS planning.\",\"PeriodicalId\":443258,\"journal\":{\"name\":\"2009 12th International Conference on Computers and Information Technology\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 12th International Conference on Computers and Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIT.2009.5407290\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 12th International Conference on Computers and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2009.5407290","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

如今,使用业务流程管理(BPM)系统在世界范围内非常流行,因此基于该技术部署信息系统(is)已成为软件工程新时代的应用程序开发方法之一。由于许多组织在没有意识或计划的情况下获取和使用该技术,这是导致此类项目失败的主要原因,我们正在寻找一种有效的方法来构建信息系统,基于组织的业务流程,以便在最短的时间内以最低的成本定义其相关软件开发项目的范围。我们已经在一些具有信息技术(IT)规划性质的项目中开始了这一领域的科学研究,并取得了显著的成果,本文将其中一个项目作为案例进行描述。这种新方法将被用作根据BPM方法定义项目组合的第一步,并用于企业架构(EA)或IT/IS计划等一些操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Using an old technique in a new technology — A novel method for defining the scope of ISs in BPM projects
Nowadays, using business process management (BPM) systems is so prevalent through the world, so that deploying information systems (IS) based on this technology has become one of the application development methods in the new age of software engineering. Due to acquisition and using this technology in many organizations without awareness or program, that is the main reason which would fail this type of projects, we are looking for an efficient method in order to grain information systems, based on organization's business processes for the sake of defining the scope of their related software development projects, in the shortest time and with the lowest cost. We have started our scientific researches on this field in a few projects with the nature of information technology (IT) planning and gained noteworthy results that one of them is described in this paper as a case study. This new method will be used as the first step in defining project portfolios according to BPM approach, and in some actions like enterprise architecture (EA) or IT/IS planning.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信