{"title":"拉东矶大坝节能溢洪道建筑疏浚结构测量实施中的应用","authors":"Meivy Carolina Pandey, M. Lubis, A. Permana, S. Pamungkas, Muhammad Adam","doi":"10.5220/0010351400400047","DOIUrl":null,"url":null,"abstract":"The Energy Reduction Building planned at Ladongi Dam utilized the Type II Olakan Flat Pond Type (USBR II). Energy absorbers in spillway buildings are very important to reduce the energy of water flow and avoid damage to rivers. The purpose of this study is to determine the role of the survey in the implementation of excavation and also the structure buildings in the field and be able to process and present measurement data. Data field collection consists of 3 working stages: excavation work, working work floor and working wall structure. The calculation of excavation volume in this final project is carried out by measurement using the Cross Section and in volume calculation using the Mean Area method. The results from this study are, the role of the survey in the construction of energy reduction building, the volume of excavation and foundry of work floors, the dental importance of wall structures, cross-section, 3-dimensional view of excavated land. LW 33 block dental volume is 138.99 m3 starting from an elevation of +60.11 to an elevation of +64.50. In Block LW 33 LW 35, a landslide occurred in the zone 3 slopes parallel to the structural parapet (El. +64.5 El. +67.5) therefore dental filling was carried out, the total required dental volume was 164,954 m3. The total volume of excavation to the work floor elevation is 505,609 m3, and the total volume of additional landslide structures is 893,329 m3.","PeriodicalId":103441,"journal":{"name":"Proceedings of the 3rd International Conference on Applied Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application on Survey Implementation of Dredging and Structure for Energy Reducing Spillway Building at Ladongi Dam\",\"authors\":\"Meivy Carolina Pandey, M. Lubis, A. Permana, S. Pamungkas, Muhammad Adam\",\"doi\":\"10.5220/0010351400400047\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Energy Reduction Building planned at Ladongi Dam utilized the Type II Olakan Flat Pond Type (USBR II). Energy absorbers in spillway buildings are very important to reduce the energy of water flow and avoid damage to rivers. The purpose of this study is to determine the role of the survey in the implementation of excavation and also the structure buildings in the field and be able to process and present measurement data. Data field collection consists of 3 working stages: excavation work, working work floor and working wall structure. The calculation of excavation volume in this final project is carried out by measurement using the Cross Section and in volume calculation using the Mean Area method. The results from this study are, the role of the survey in the construction of energy reduction building, the volume of excavation and foundry of work floors, the dental importance of wall structures, cross-section, 3-dimensional view of excavated land. LW 33 block dental volume is 138.99 m3 starting from an elevation of +60.11 to an elevation of +64.50. In Block LW 33 LW 35, a landslide occurred in the zone 3 slopes parallel to the structural parapet (El. +64.5 El. +67.5) therefore dental filling was carried out, the total required dental volume was 164,954 m3. The total volume of excavation to the work floor elevation is 505,609 m3, and the total volume of additional landslide structures is 893,329 m3.\",\"PeriodicalId\":103441,\"journal\":{\"name\":\"Proceedings of the 3rd International Conference on Applied Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 3rd International Conference on Applied Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5220/0010351400400047\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 3rd International Conference on Applied Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5220/0010351400400047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

拉东吉大坝节能建筑采用的是II型奥拉坎平塘型(USBR II),泄洪道建筑中的能量吸收装置对降低水流能量,避免对河流的破坏具有重要意义。本研究的目的是确定调查在实施挖掘和现场结构建筑中的作用,并能够处理和呈现测量数据。数据现场采集包括3个工作阶段:开挖工作、工作底板和工作墙体结构。最终工程的开挖体积计算采用横截面法测量,体积计算采用平均面积法。本研究的结果是,调查在节能建筑建设中的作用,挖掘和铸造工作楼层的体积,墙体结构的重要性,断面,挖掘土地的三维视图。lw33砌块牙体体积为138.99 m3,从海拔高度+60.11到海拔高度+64.50。在lw33 lw35地块,与结构胸墙平行的3区边坡发生滑坡。+ 64.5埃尔。+67.5),因此进行补牙,所需牙齿总体积为164,954 m3。开挖至工作层标高的总体积为505,609 m3,附加滑坡结构的总体积为893,329 m3。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application on Survey Implementation of Dredging and Structure for Energy Reducing Spillway Building at Ladongi Dam
The Energy Reduction Building planned at Ladongi Dam utilized the Type II Olakan Flat Pond Type (USBR II). Energy absorbers in spillway buildings are very important to reduce the energy of water flow and avoid damage to rivers. The purpose of this study is to determine the role of the survey in the implementation of excavation and also the structure buildings in the field and be able to process and present measurement data. Data field collection consists of 3 working stages: excavation work, working work floor and working wall structure. The calculation of excavation volume in this final project is carried out by measurement using the Cross Section and in volume calculation using the Mean Area method. The results from this study are, the role of the survey in the construction of energy reduction building, the volume of excavation and foundry of work floors, the dental importance of wall structures, cross-section, 3-dimensional view of excavated land. LW 33 block dental volume is 138.99 m3 starting from an elevation of +60.11 to an elevation of +64.50. In Block LW 33 LW 35, a landslide occurred in the zone 3 slopes parallel to the structural parapet (El. +64.5 El. +67.5) therefore dental filling was carried out, the total required dental volume was 164,954 m3. The total volume of excavation to the work floor elevation is 505,609 m3, and the total volume of additional landslide structures is 893,329 m3.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信