{"title":"动态仿真有助于提高发电机保护","authors":"R. Sandoval, A. Guzman, H. Altuve","doi":"10.1109/PSAMP.2007.4740896","DOIUrl":null,"url":null,"abstract":"This paper describes a digital simulation study of a set of two 160 MW generating units operating in the Juan de Dios Batiz Paredes thermal power station, in Topolobampo, Sinaloa, Mexico. This plant belongs to Comision Federal de Electricidad, the national Mexican utility. We first discuss the factors that limit the active and reactive power delivered by a generating unit, such as thermal and voltage limits, power-system imposed limits, and the minimum excitation limiter. We then describe generator protection functions related to the capability curve. Later, we propose a P-Q plane-based scheme that provides generator loss-of-field protection and capability-curve violation alarming. Finally, we present the simulation results of loss-of-field and loss-of-synchronism conditions of one of the two generating units for several cases, including different initial load conditions, different loss-of-field modes, and different numbers of units on line.","PeriodicalId":114949,"journal":{"name":"2007 Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources","volume":"21 3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":"{\"title\":\"Dynamic simulations help improve generator protection\",\"authors\":\"R. Sandoval, A. Guzman, H. Altuve\",\"doi\":\"10.1109/PSAMP.2007.4740896\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a digital simulation study of a set of two 160 MW generating units operating in the Juan de Dios Batiz Paredes thermal power station, in Topolobampo, Sinaloa, Mexico. This plant belongs to Comision Federal de Electricidad, the national Mexican utility. We first discuss the factors that limit the active and reactive power delivered by a generating unit, such as thermal and voltage limits, power-system imposed limits, and the minimum excitation limiter. We then describe generator protection functions related to the capability curve. Later, we propose a P-Q plane-based scheme that provides generator loss-of-field protection and capability-curve violation alarming. Finally, we present the simulation results of loss-of-field and loss-of-synchronism conditions of one of the two generating units for several cases, including different initial load conditions, different loss-of-field modes, and different numbers of units on line.\",\"PeriodicalId\":114949,\"journal\":{\"name\":\"2007 Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources\",\"volume\":\"21 3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-03-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PSAMP.2007.4740896\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSAMP.2007.4740896","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27
摘要
本文描述了在墨西哥锡那罗亚州Topolobampo的Juan de Dios Batiz Paredes热电厂运行的两台160兆瓦发电机组的数字仿真研究。该工厂属于墨西哥国家公用事业公司联邦电力委员会。我们首先讨论了限制发电机组输出的有功和无功功率的因素,如热和电压限制、电力系统施加的限制和最小励磁限制器。然后描述了与能力曲线相关的发电机保护功能。随后,我们提出了一种基于P-Q平面的方案,该方案提供了发电机失场保护和能力曲线违反报警。最后,给出了不同初始负荷条件、不同失电模式、不同机组在线数量等情况下,其中一台发电机组的失电和失同步情况的仿真结果。
Dynamic simulations help improve generator protection
This paper describes a digital simulation study of a set of two 160 MW generating units operating in the Juan de Dios Batiz Paredes thermal power station, in Topolobampo, Sinaloa, Mexico. This plant belongs to Comision Federal de Electricidad, the national Mexican utility. We first discuss the factors that limit the active and reactive power delivered by a generating unit, such as thermal and voltage limits, power-system imposed limits, and the minimum excitation limiter. We then describe generator protection functions related to the capability curve. Later, we propose a P-Q plane-based scheme that provides generator loss-of-field protection and capability-curve violation alarming. Finally, we present the simulation results of loss-of-field and loss-of-synchronism conditions of one of the two generating units for several cases, including different initial load conditions, different loss-of-field modes, and different numbers of units on line.