Delpiah Wahyuningsih, H. Pradana, Hamidah
{"title":"Prediction of The Needs of Industrial Oil Fuels with The Implementation of Distribution Requirement Planning (DRP)","authors":"Delpiah Wahyuningsih, H. Pradana, Hamidah","doi":"10.1109/icitisee.2018.8721002","DOIUrl":null,"url":null,"abstract":"Currently, oil fuels are a primary need for the community for motorized, such as vehicles. Fuels in Indonesia, which is held by PT. Pertamina, many companies which are covered by Pertamina to diesel oil fuels. The demand for diesel fuels are very large. That is, from several entrepreneurs’ such as palm oil, supermarket, and others level of stores. The companies sometimes cannot meet the customer needs. So, for the ordering the diesel fuel is limited, especially oil orders that make by branch companies who had a limited oil distribution stock. Here, we need a system that can analyze the needs of diesel oil distribution for companies or their branch using the Distribution Requirement Planning (DRP) method. DRP is an application to determine the calculation of the need for distribution of diesel oil each period (especially for one year). Companies and their branches benefit can get from DRP application where DRP itself makes predictions or measurements for the needs of diesel fuel for one period, namely the distribution of diesel oil over the next year, the need for distribution of diesel oil every month can be seen in detail. DRP will show the calculation of Planned Order Receipt and Planned Orders Release (POR), Gross Requirements (GR), Projected on Hand (PoH), and Net Requirements (NR). So, that they do not experience delays in the request process from customers.","PeriodicalId":180051,"journal":{"name":"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/icitisee.2018.8721002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

目前,石油燃料是社会对机动车辆等的主要需求。印尼国家石油公司(PT. Pertamina)持有的燃料,印尼国家石油公司(PT. Pertamina)旗下的许多公司都是柴油燃料。对柴油的需求非常大。也就是从几个企业家的棕榈油、超市等层次的店铺做起。公司有时不能满足客户的需求。因此,对于柴油的订购是有限的,特别是分公司的石油订单,这些分公司的石油分销库存有限。在此,我们需要一个能够运用配送需求规划(DRP)方法分析企业或分公司柴油配送需求的系统。DRP是一种应用程序,用于确定每个时期(特别是一年)柴油分配需求的计算。公司及其分支机构可以从DRP应用中受益,DRP本身对一个时期的柴油需求进行预测或测量,即下一年的柴油分配,每个月的柴油分配需求可以详细看到。DRP将显示计划订单接收和计划订单释放(POR)、总需求(GR)、预计库存(PoH)和净需求(NR)的计算。这样,他们就不会在客户的请求过程中遇到延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Prediction of The Needs of Industrial Oil Fuels with The Implementation of Distribution Requirement Planning (DRP)
Currently, oil fuels are a primary need for the community for motorized, such as vehicles. Fuels in Indonesia, which is held by PT. Pertamina, many companies which are covered by Pertamina to diesel oil fuels. The demand for diesel fuels are very large. That is, from several entrepreneurs’ such as palm oil, supermarket, and others level of stores. The companies sometimes cannot meet the customer needs. So, for the ordering the diesel fuel is limited, especially oil orders that make by branch companies who had a limited oil distribution stock. Here, we need a system that can analyze the needs of diesel oil distribution for companies or their branch using the Distribution Requirement Planning (DRP) method. DRP is an application to determine the calculation of the need for distribution of diesel oil each period (especially for one year). Companies and their branches benefit can get from DRP application where DRP itself makes predictions or measurements for the needs of diesel fuel for one period, namely the distribution of diesel oil over the next year, the need for distribution of diesel oil every month can be seen in detail. DRP will show the calculation of Planned Order Receipt and Planned Orders Release (POR), Gross Requirements (GR), Projected on Hand (PoH), and Net Requirements (NR). So, that they do not experience delays in the request process from customers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信