{"title":"基于RACI矩阵的项目干系人管理研究","authors":"R. Suhanda, D. Pratami","doi":"10.25124/ijies.v5i02.134","DOIUrl":null,"url":null,"abstract":"Stakeholders are one of the most significant factors in the success of a project. The creation of good team performance in a project is caused by clear work responsibilities given to each project stakeholder so that stakeholders have responsibility for their work and can complete their work correctly. The responsibility assignment matrix is ​​a method for managing the roles of each resource and describing the relationship between jobs for each job in the project, which is classified into four parts, namely Responsible, Assignment, Consult, and Informed. In this paper, a matrix will be designed to manage the work assignments of each stakeholder involved in the case of delays in project completion at PT. XYZ uses the RACI Matrix method as a guide. The results of the work assignment matrix design in the case study project of PT. XYZ shows that 12 stakeholders are grouped into four classifications according to the RACI components, which are arranged based on the level of interest and responsibility of each stakeholder to the project.","PeriodicalId":217640,"journal":{"name":"International Journal of Innovation in Enterprise System","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"RACI Matrix Design for Managing Stakeholders in Project Case Study of PT. XYZ\",\"authors\":\"R. Suhanda, D. Pratami\",\"doi\":\"10.25124/ijies.v5i02.134\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Stakeholders are one of the most significant factors in the success of a project. The creation of good team performance in a project is caused by clear work responsibilities given to each project stakeholder so that stakeholders have responsibility for their work and can complete their work correctly. The responsibility assignment matrix is ​​a method for managing the roles of each resource and describing the relationship between jobs for each job in the project, which is classified into four parts, namely Responsible, Assignment, Consult, and Informed. In this paper, a matrix will be designed to manage the work assignments of each stakeholder involved in the case of delays in project completion at PT. XYZ uses the RACI Matrix method as a guide. The results of the work assignment matrix design in the case study project of PT. XYZ shows that 12 stakeholders are grouped into four classifications according to the RACI components, which are arranged based on the level of interest and responsibility of each stakeholder to the project.\",\"PeriodicalId\":217640,\"journal\":{\"name\":\"International Journal of Innovation in Enterprise System\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Innovation in Enterprise System\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25124/ijies.v5i02.134\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Innovation in Enterprise System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25124/ijies.v5i02.134","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

干系人是项目成功的最重要因素之一。在项目中创造良好的团队绩效,是由于给每个项目干系人明确的工作职责,使干系人对自己的工作负责,并能正确地完成自己的工作。责任分配矩阵是管理项目中每个资源的角色和描述每个工作之间的关系的方法,分为四个部分,分别是Responsible, assignment, Consult, Informed。在本文中,将设计一个矩阵来管理在PT项目完成延迟的情况下涉及的每个涉众的工作分配。XYZ使用RACI矩阵方法作为指导。在PT. XYZ的案例研究项目中,工作分配矩阵设计的结果显示,12个干系人根据RACI组件分为四类,这些组件是根据每个干系人对项目的兴趣和责任级别进行安排的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
RACI Matrix Design for Managing Stakeholders in Project Case Study of PT. XYZ
Stakeholders are one of the most significant factors in the success of a project. The creation of good team performance in a project is caused by clear work responsibilities given to each project stakeholder so that stakeholders have responsibility for their work and can complete their work correctly. The responsibility assignment matrix is ​​a method for managing the roles of each resource and describing the relationship between jobs for each job in the project, which is classified into four parts, namely Responsible, Assignment, Consult, and Informed. In this paper, a matrix will be designed to manage the work assignments of each stakeholder involved in the case of delays in project completion at PT. XYZ uses the RACI Matrix method as a guide. The results of the work assignment matrix design in the case study project of PT. XYZ shows that 12 stakeholders are grouped into four classifications according to the RACI components, which are arranged based on the level of interest and responsibility of each stakeholder to the project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信