先进技术效益评价:期望和已获得的经验

J. Hynek, V. Janeček
{"title":"先进技术效益评价:期望和已获得的经验","authors":"J. Hynek, V. Janeček","doi":"10.1109/INES.2010.5483827","DOIUrl":null,"url":null,"abstract":"This paper presents selected results of a recent survey focused on the problems of advanced manufacturing technology benefits identification and evaluation that was carried out in the Czech Republic in 2009. We will present some pieces of evidence that managers of manufacturing companies are unable to identify and evaluate these benefits properly and that there are huge differences between benefits expected when the relevant project is in the assessment phase and the benefits really attained after the project has reach the stage of routine operation. Moreover, we will put these results within international context and we will compare the findings derived from our survey with the results that were ascertained by our predecessors in the United Kingdom.","PeriodicalId":118326,"journal":{"name":"2010 IEEE 14th International Conference on Intelligent Engineering Systems","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Advanced technology benefits evaluation: Expectations and attained experience\",\"authors\":\"J. Hynek, V. Janeček\",\"doi\":\"10.1109/INES.2010.5483827\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents selected results of a recent survey focused on the problems of advanced manufacturing technology benefits identification and evaluation that was carried out in the Czech Republic in 2009. We will present some pieces of evidence that managers of manufacturing companies are unable to identify and evaluate these benefits properly and that there are huge differences between benefits expected when the relevant project is in the assessment phase and the benefits really attained after the project has reach the stage of routine operation. Moreover, we will put these results within international context and we will compare the findings derived from our survey with the results that were ascertained by our predecessors in the United Kingdom.\",\"PeriodicalId\":118326,\"journal\":{\"name\":\"2010 IEEE 14th International Conference on Intelligent Engineering Systems\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-05-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE 14th International Conference on Intelligent Engineering Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INES.2010.5483827\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE 14th International Conference on Intelligent Engineering Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INES.2010.5483827","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文介绍了最近的一项调查的选择结果,该调查侧重于2009年在捷克共和国进行的先进制造技术效益识别和评估问题。我们将提供一些证据,证明制造企业的管理者无法正确地识别和评估这些效益,并且相关项目在评估阶段的预期效益与项目进入常规运行阶段后实际获得的效益之间存在巨大差异。此外,我们将把这些结果放在国际背景下,我们将把我们的调查结果与我们在英国的前辈确定的结果进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Advanced technology benefits evaluation: Expectations and attained experience
This paper presents selected results of a recent survey focused on the problems of advanced manufacturing technology benefits identification and evaluation that was carried out in the Czech Republic in 2009. We will present some pieces of evidence that managers of manufacturing companies are unable to identify and evaluate these benefits properly and that there are huge differences between benefits expected when the relevant project is in the assessment phase and the benefits really attained after the project has reach the stage of routine operation. Moreover, we will put these results within international context and we will compare the findings derived from our survey with the results that were ascertained by our predecessors in the United Kingdom.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信